Opportunity

SAM #70LGLY26QGLB00040

TSA Training Academy Facility Renovation at FLETC Glynco

Buyer

FLETC Glynco Procurement Office

Posted

August 04, 2026

Respond By

August 20, 2026

Identifier

70LGLY26QGLB00040

NAICS

236220, 238290, 238220, 238190, 238310

This opportunity involves a major facility renovation at the TSA Training Academy, located within the Federal Law Enforcement Training Centers (FLETC) Glynco campus in Brunswick, Georgia. - Government Buyer: - Department of Homeland Security, Federal Law Enforcement Training Centers (FLETC) Glynco Procurement Office - Transportation Security Administration (TSA) Training Academy at FLETC Glynco - OEMs and Vendors: - No specific OEMs or brands are named in the solicitation or attachments - Products/Services Requested: - Replacement of 105 packaged terminal air conditioner (PTAC) units (various sizes: 3.0, 3.5, 4.0, and 5.0 ton) - Installation of 134 interior recirculating ceiling fans (2x2' tile fans for suspended ceilings) - Installation of one exterior marine-grade canopy fan (12" diameter) - Replacement of exterior doors with steel double doors (insulated core, view ports, ADA-compliant hardware) - Installation and modification of ADA-compliant ramps at multiple modular buildings - Repair of soft floor spots in modular buildings (approx. 2x2 ft each) - Installation of approximately 6,000 sq ft of 4-inch concrete for a bleacher apron (with accessible seating features) - Cleaning and repair of trench drains (including replacement of damaged ADA-compliant grates) - Unique/Notable Requirements: - All HVAC units require coated coils, heat pumps, heat strips, marine-grade finish, digital programmable controls, and washable filters - ADA compliance is emphasized for ramps, doors, fan controls, and drain grates - Steel doors must have tempered safety glass view ports and FLETC OSPR-specified locks - Concrete work must meet minimum 3000 psi compressive strength and include accessible seating - Floor repairs must use compatible slip-resistant materials; carpet tiles provided by the Government - Trench drain cleaning requires high-pressure water jet, vacuum, and hand tools - All work must be performed by certified/licensed contractors - No specific part numbers or brands are listed; full technical details are in the attached documents.

Description

The TSA Training Academy, located within FLETC Glynco, requires comprehensive facility upgrades across its modular buildings. The need for this procurement arose from aging infrastructure, accessibility requirements, and the need to improve energy efficiency and security. The project includes HVAC replacement, ceiling and canopy fan installation, steel door replacement, ADA ramp installation/modification, concrete work, and drainage improvements. Functions to be performed: • Replace 105 wall-mounted package HVAC units (various sizes with coated coils, heat pumps, and heat strips) • Install 134 ceiling fans and one 12-foot outdoor canopy fan • Replace exterior doors with steel double doors (with view ports) and FLETC OSPR-specified locks • Install ADA ramps at four buildings and modify one ramp for improved accessibility • Repair soft floor spots in two modular buildings • Install ~6,000 sq. ft. of 4-inch concrete for the bleacher area under the canopy • Clean trench drains adjacent to the canopy

SEE ATTACHED SYNOPSIS/SOLICITATION AND ASSOCIATED ATTACHMENTS (1-7)

View original listing