Opportunity

Worcester Worcester #8778-M7

Vernon Hill School Kitchen and Cafeteria Relocation – Plumbing, HVAC, and Equipment Installation

Posted

July 30, 2026

Respond By

August 26, 2026

Identifier

8778-M7

NAICS

238220, 238290

This opportunity involves the relocation of the kitchen and cafeteria at Vernon Hill School in Worcester, MA, managed by the City of Worcester's Department of Public Works and Parks, Architectural Division. - Government Buyer: - City of Worcester, Department of Public Works and Parks, Architectural Division - OEMs and Vendors: - Schier (Grease Interceptor) - A.O. Smith (Electric Water Heater) - Alerton (Automatic Temperature Controls) - Products/Services Requested: - Grease Interceptor (Schier Great Basin GB-50 or equivalent), quantity: 1 - Electric Water Heater (A.O. Smith DRE-52-30, alternate), quantity: 1 - Installation of automatic temperature controls (Alerton system) - Selective demolition and legal disposal of materials - Cast-in-place concrete work for exterior equipment slab - Complete plumbing system installation (sanitary, waste, vent, cold/hot water, grease waste, valves, insulation, supports, testing) - Mechanical installation (HVAC ductwork, heat-only energy recovery ventilator, controls, testing, balancing, equipment rigging) - Unique/Notable Requirements: - Grease interceptor must be Schier Great Basin GB-50 or equivalent, with specific performance and construction criteria - Water heater is an alternate item, A.O. Smith DRE-52-30 or equivalent - Use of Alerton system for automatic temperature controls - No new plumbing fixtures; focus is on system installation and equipment connections - Coordination with Worcester Public Schools for kitchen equipment installation - Compliance with city waste management and utility protection standards - Filed sub-bids required for plumbing and HVAC work

Description

This solicitation is for the relocation of the kitchen and cafeteria at Vernon Hill School from the third floor to a new basement location. The work includes installing WPS-provided equipment, selective demolition, constructing a new exterior equipment slab, and installing new plumbing and HVAC systems with temporary HVAC measures during installation. The project involves general building construction with filed sub-bids for plumbing and HVAC. A pre-bid meeting is scheduled for August 12, 2026, at the Vernon Hill School.

View original listing