Opportunity
My Florida Marketplace #42366
Comprehensive Renovation of Security Residence at Pablo Creek Conservation Area
Posted
July 31, 2026
Respond By
August 11, 2026
Identifier
42366
NAICS
236118, 238350, 238220, 238210
The St. Johns River Water Management District is seeking a qualified Florida General Contractor to renovate and restore a security residence at the Pablo Creek Conservation Area. - Government Buyer: - St. Johns River Water Management District - Project Scope: - Comprehensive renovation and restoration of an existing dwelling unit for tenant occupancy - Includes demolition, installation, and finishing work across multiple trades (roofing, electrical, plumbing, HVAC) - Contractor responsible for all permits, labor, supervision, materials, equipment, inspections, site restoration, and cleanup - Products and Materials Requested: - Approximately 910 sq. ft. of waterproof, scratch-resistant Luxury Vinyl Tile (LVT) flooring - 1 steel exterior door and storm door - 1 set of Hampton Bay assembled shaker-style kitchen cabinets and laminate countertops (or approved equal) - 1 set of General Electric appliances: 18-cubic-foot refrigerator, dishwasher, electric range, and range hood - 1 drop-in single-bowl kitchen sink and pull-down kitchen faucet (e.g., Kohler Sous or approved equal) - 1 set of master bathroom fixtures (toilet, vanity, sink, bathtub/shower unit, valves, plumbing fixtures) - 10 HVAC system registers - 64 sq. ft. of replacement drywall - 1 aluminum overhead garage door (16 ft. wide) - 1 steel exterior garage service door (36" x 80") - 532 sq. ft. of garage ceiling repair and painting - 95 linear feet of six-inch seamless gutters and at least 6 downspouts - 1 exterior aluminum canopy awning (approx. 4 ft. x 4 ft.) - Services Requested: - Demolition and disposal of existing fixtures and materials - Site preparation, permitting, and project management - Site safety, housekeeping, and temporary utilities - Installation and finishing of all specified products - Post-construction cleaning for tenant readiness - Unique/Notable Requirements: - Field verification of all dimensions and conditions - Strict adherence to permitting, safety, and project management protocols - Mandatory pre-bid meeting attendance - All work must be substantially completed within a 45-day continuous work period after Notice to Proceed - OEMs Highlighted: - General Electric (appliances) - Hampton Bay (kitchen cabinets) - Kohler (kitchen faucet, or approved equal) - Estimated Budget: - $60,000
Description
The St. Johns River Water Management District is seeking qualified contractors with a current, active Florida General Contractor license to renovate and restore an existing dwelling unit at the recently acquired Pablo Creek Conservation Area property. The work includes obtaining permits, labor, supervision, materials, equipment, inspections, site restoration, and cleanup. All work must be substantially completed and accepted by the District no later than September 30, 2026. A mandatory pre-bid meeting is scheduled for August 4, 2026, and the bid submission deadline is August 11, 2026.