Opportunity

SAM #N4008526R9077

Camp Lejeune WWTP FC436 Clarifier and G575 Lift Station Repairs – Flygt Pumps, Hoist, and Infrastructure Upgrades

Buyer

Naval Facilities Engineering Systems Command Mid-Atlantic

Posted

July 31, 2026

Respond By

August 31, 2026

Identifier

N4008526R9077

NAICS

237110, 237990, 238220, 238210, 238190

This opportunity involves major repairs and upgrades to wastewater treatment infrastructure at Camp Lejeune, North Carolina, led by the U.S. Navy and U.S. Marine Corps. - Government Buyer: - U.S. Navy, ROICC Camp Lejeune - U.S. Marine Corps, Marine Corps Base Camp Lejeune and Camp Geiger - Public Works Division, Marine Corps Installations East - OEMs and Vendors: - Flygt (Xylem Inc.) is specified as the manufacturer for submersible sewage pumps - ECS Southeast, LLC and Scientific Analytical Institute, Inc. provided environmental survey services - Products/Services Requested: - Replacement of internal components and control panels for secondary clarifiers at WWTP FC436 - Phased construction upgrades at G575 Lift Station, including: - Replacement of four submersible sewage pumps (two 35 HP and two 110 HP Flygt pumps) - Installation of new x-y multidirectional hoist (crane) - Repair or replacement of five manholes - Upgrades to piping, new gravity sewer pipes, and manholes - Electrical upgrades: new motor controls, upsized VFDs (with spares), surge and lightning protection, and generator capacity evaluation - Structural improvements: new crane support beams and columns - Installation of heavy hex head ASTM F 1554 Grade 36 anchor bolts - Environmental survey for asbestos and lead paint (no asbestos found; lead paint present on select surfaces at G575) - Notable Requirements: - Only three pre-approved contractors may submit proposals - Compliance with Buy American construction material requirements - Detailed technical specifications for pumps (Flygt N 3202 MT 3~ 642 and Flygt N 3315 MT 3~ 637) and electrical/structural upgrades - Contract value estimated between $5M and $10M - Contract completion required within 270 days after award

Description

The work includes replacement of secondary clarifier no. 4 internal components, replacement of control panels for all four secondary clarifiers.  (PWO 24-0045) 

The work at G575 includes phased construction of upgrades to manholes and piping(removal/replacement/new installation); removal and replacement of submersible pumps and removal and replacement of the existing crane over the wet well. (PWO 26-0044)

View original listing