Opportunity
SAM #2032H326R00017
Treasury Vault 9 CRAC Unit Replacement and Secure Door Installation
Buyer
National Office of Tribal Partnership and Services
Posted
July 31, 2026
Respond By
August 31, 2026
Identifier
2032H326R00017
NAICS
236220, 238290, 238210, 238220
This opportunity involves a construction and mechanical upgrade project for Vault 9 at the Main Treasury Building, led by the Department of the Treasury and supported by the General Services Administration. - Government Buyer: - Department of the Treasury, Departmental Offices, Procurement Services Division, Financial Management - General Services Administration (GSA), GSA PM - OEMs and Vendors: - Liebert (CRAC units) - ClarkDietrich (steel framing components) - Xylem (balance valves, as referenced for equivalency) - Siemens (Building Automation System controls integration) - Products and Services Requested: - Removal and installation of two Liebert CRAC (Computer Room Air Conditioning) units (Model CRAC-9-1 and CRAC-9-1A, part number 7540-01-152-8067) - Installation of new chilled water, cold water, and condensate drain lines - Installation of new STC-50 sound-rated acoustic steel doors (Types A and B) with heavy-duty federal-spec hardware (including X-10/CDX-10 locks, electrified mortise locksets, and card readers) - ClarkDietrich steel jambs (362HD300-97) and header brackets (350HDSC300-97) - Rockwool acoustical fire batt insulation and Type X gypsum wallboard for fire and soundproofing - Electrical work: new circuits, raceways, wiring, disconnects, and SCIF EMI power filters - Siemens BAS controls integration (BACnet interface, sensors, programming) - Certified air and water balancing, factory start-up, and training - Unique or Notable Requirements: - All work must comply with federal safety, security, and Buy American regulations - Doors must meet ICD/ICS 705 security and STC-50 acoustic standards, with UL 2050 and FF-L-2740 compliance - Integration with Siemens Building Automation System is required - One-year warranty on installed equipment - Coordination to maintain cooling during CRAC replacement - All installations must follow detailed engineering and mechanical drawings
Description
Construction project for the Main Treasury to Remove and install the CRAC units in Vault 9 and remove, modify and install two new doors in Vault 9 as outlined in: a) MT Vault 9 M&E drawings dated 3-19-26 and b) MT Vault 9 Installation of New Doors dated 6-6-26.