Opportunity

Seattle Procureware #PW#2018-018

Seattle Solicits Bids for Major Tunnel Storage and Conveyance Construction Project

Posted

March 05, 2019

Respond By

June 12, 2019

Identifier

PW#2018-018

NAICS

237110, 237990

This opportunity involves a major infrastructure project for the City of Seattle focused on tunnel storage and conveyance: - Government Buyer: City of Seattle, via Seattle Procureware - Project Scope: - Construction of a 13,939-foot-long, 18-foot 10-inch diameter tunnel using a pressurized face Tunnel Boring Machine (TBM) - Installation of 5 shafts with associated civil, architectural, structural, mechanical, HVAC, electrical, and instrumentation work - Construction of a 646-foot-long, 94-inch diameter conveyance tunnel under the Lake Washington Ship Canal using a Microtunnel Boring Machine (MTBM) - Surface conveyance piping, structures, and site restoration at all shaft locations - OEMs and Vendors: - Multiple tunnel construction and engineering firms referenced, including Barnard Walsh LLC, Kenny Construction, Kiewit-McNally, Lane Construction, Michels Corporation, Tunnel Storage JV, Traylor-Shea JV - DBE-certified subcontractors for specialized services: Rivera Masonry, Commercial Fence Corporation, Kroner Environmental Services, Sundancer Electric Inc., AAA Contractors Inc., Hydro2Geotech LLC, Marshbank Construction, Inc. - Products/Services Requested: - Tunnel Boring Machine (TBM) and Microtunnel Boring Machine (MTBM) installation - Shaft construction, surface piping, and site restoration - Specialized services: masonry, fencing, environmental consulting, electrical operations, rock wall construction, geotechnical instrumentation, demolition - Notable Requirements: - Disadvantaged Business Enterprise (DBE) participation is required, with specific DBE-certified subcontractors identified for key tasks - Project classified under NAICS 237110 (Water and Sewer Line and Related Structures Construction)

Description

This solicitation is for the installation of a 13,939 foot-long, 18-foot 10-inch internal diameter, segmentally lined tunnel using a pressurized face Tunnel Boring Machine (TBM). The project includes construction of 5 shafts with civil, architectural, structural, mechanical, HVAC, electrical, and instrumentation work. Additionally, it involves installing a 646 foot-long, 94-inch internal diameter conveyance tunnel under the Lake Washington Ship Canal using a Microtunnel Boring Machine (MTBM), surface conveyance piping and structures, and site restoration at all shaft locations. The work is located at the Lake Washington Ship Canal in Seattle, WA.

View original listing