Opportunity
Georgia Procurement Registry #27011-B
Fayette County Seeks Bids for Reinforced Concrete Culvert Replacement Project
Posted
July 29, 2026
Respond By
August 24, 2026
Identifier
27011-B
NAICS
237990
Fayette County Board of Commissioners is seeking bids for a culvert replacement project in the Brandon Mill Subdivision. - Government Buyer: - Fayette County Board of Commissioners (Fayette County, Georgia) - Project Scope: - Replacement of deteriorating metal pipe culverts with reinforced concrete pipe-arch culverts at three locations: 115 & 105 Brandon Mill Circle and 115/120 Heritage Way - Removal of existing corrugated metal pipes (CMP) in 18-inch, 24-inch, and 36-inch diameters - Installation of new reinforced concrete pipes (RCP) of matching diameters and 28 linear feet each - Removal and construction of catch basin tops, paving of catch basin inverts, grouting around pipes, and asphalt paving - Site restoration including sod, mulch, and curb & gutter work - Traffic control, clearing & grubbing, temporary grassing, and sediment control - Products/Materials Requested: - Reinforced concrete pipe (RCP), Class III, in 18", 24", and 36" diameters - Class A concrete, recycled asphalt concrete (9.5 mm and 19 mm Superpave), steel bar No. 5, sod, mulch, and concrete curb & gutter - Services Requested: - Traffic control, clearing & grubbing, materials testing & inspections, temporary grassing, and sediment trap construction/removal - Notable Requirements: - All work must comply with Georgia Department of Transportation (GDOT) standards and Fayette County regulations - Bidders must be GDOT prequalified contractors - Contractor responsible for permits and utility coordination/relocation - Work must remain within existing rights-of-way - No specific OEMs are named; focus is on standard construction materials and methods
Description
Fayette County, Georgia is soliciting bids to replace deteriorating metal pipe culverts with reinforced concrete pipe-arch culverts at three locations: 115 & 105 Brandon Mill Circle and 115/120 Heritage Way. The project involves removing existing catch basin tops and deteriorated corrugated metal pipes and replacing them with reinforced concrete pipes of various diameters, along with paving, grouting, constructing new catch basin tops, and utility coordination or relocation. The work will be performed under one contract and will remain within existing rights-of-way. Bids are due by 3:00 PM on Monday, August 24, 2026, and questions can be directed to Sherry White via email.