Opportunity
SAM #140P4326R0031
Fire Sprinkler System Repairs and Upgrades at Boston National Historical Park
Buyer
NPS Natural Resources Stewardship and Science Directorate
Posted
July 30, 2026
Respond By
August 27, 2026
Identifier
140P4326R0031
NAICS
238290, 238220
This opportunity is for comprehensive fire sprinkler system repairs and upgrades at Boston National Historical Park, managed by the National Park Service (Department of the Interior). - Government Buyer: - Department of the Interior, National Park Service, Northeast Region, New England Major Acquisition Buying Office, Boston National Historical Park - Scope of Work: - Correction of fire sprinkler system deficiencies across multiple historic buildings (Building 109 as base, plus up to ten option buildings) - Includes hydrostatic testing, replacement of failed or aged sprinkler heads (quantities from 4 to 771 per building), flow switches, angle valves, escutcheons, coverplates, and FDC (Fire Department Connection) signage - Installation of hydraulic placards, inspector test connections, and electric bells to replace inoperative water motor gongs - All work must comply with NFPA 25 standards and DOI/NPS policies - Restoration of historic features as required - Products/Services Requested: - Replacement of hundreds of sprinkler heads (including those in service for 75+ years) - Replacement of flow switches (multiple sizes), angle valves, escutcheons, coverplates, simese caps, and butterfly valves - Hydrostatic and air leakage testing, installation of signage and placards, and repair/replacement of alarm devices - Unique/Notable Requirements: - Work must be performed in historic buildings, requiring restoration of historic features - Strict adherence to NFPA 25 inspection, testing, and maintenance standards - All labor, materials, permits, and restoration included - OEMs and Vendors: - No specific OEMs or brands are named in the solicitation or attachments; products must meet NFPA and industry standards - Contract Structure: - Base CLIN for Building 109, with up to ten option CLINs for additional buildings - 120-day completion period after notice to proceed
Description
Boston National Historical Park (BOST) Fire Sprinkler Repair