Opportunity

SAM #N0010426QXB91

Procurement of LEAD, TEST, O2 SENSOR for Navy Weapon Systems Support

Buyer

NAVSUP Weapon Systems Support (WSS) Mechanicsburg

Posted

July 30, 2026

Respond By

August 31, 2026

Identifier

N0010426QXB91

NAICS

334412, 336419, 334511, 423860, 423690

NAVSUP Weapon Systems Support Mechanicsburg (NAVSUP WSS MECH), under the Department of the Navy, is seeking quotes for a specialized sensor component: - Procuring: LEAD, TEST, O2 SENSOR - Part number: 6915273 - Designed and specified by Cage Code 53711 (Naval Ship Systems Engineering Station, typically associated with General Dynamics Electric Boat) - Key requirements: - MIL-STD packaging and compliance with MIL-STD-130 and MIL-DTL-19595 - Government source inspection required - Item Unique Identification (IUID) compliance per DFARS 252.211-7003 - 100% production lot testing at Naval Surface Warfare Center Indian Head Explosive Ordnance Disposal Technology Division - Only authorized distributors of the OEM may submit offers; traceability documentation from the OEM is required if not the manufacturer - Contract includes an option to increase the quantity by up to 100% within 365 days of award - No specific OEM name is provided beyond Cage Code 53711, but this code is commonly linked to General Dynamics Electric Boat

Description

CONTACT INFORMATION 4 N774.3 BV5 771-229-0488 russell.w.kreider.civ@us.navy.mil ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023) 19 |||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996) 2 ||| PRODUCTION LOT TESTING 1120 GENERAL INFORMATION-FOB-DESTINATION Destination WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023) 16 Invoice and Receiving Report (Combo) To Be Determined N00104 To Be Determined See Schedule To Be Determined See Schedule To Be Determined See Schedule To Be Determined See Schedule To Be Determined See Schedule To Be Determined |||||||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18) 1 WSS Mechanicsburg MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE 1 SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)-BASIC (DEV 2026-O0037)(FEB 2026) 2 OPTION FOR INCREASED QUANTITY (MAR 1989) 1 365 days after contract award date CONTRACTOR PURCHASING SYSTEM ADMINISTRATION-BASIC (DEVIATION 2026-O0015) 1 SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026) 7 |||||||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024) 1 ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026) 13 x |||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENERGY PROGRAM USE (APRIL 2008) 2 x Additional Instructions: Electronic submission of quotes: Send to RUSSELL.W.KREIDER.CIV@US.NAVY.MIL. General Requirements: MIL-STD Packaging, Government Source Inspection Required. FOB destination: Quotes must include shipping costs. RFQ purpose: For a BUY/Procurement, requiring written acceptance prior to execution. Price type: Only Firm-Fixed Price (FFP) accepted. IUID compliance: Must adhere to DFARS 252.211-7003. Authorized source: Awardee must be authorized; no delays for unauthorized sources. Quote details for justification: Include unit price, total price, lead time, award CAGE, inspection & acceptance CAGE, cost breakdown, expiration date, delivery vehicle. Traceability: If not manufacturer, provide OEM authorization letter. Production Lot Testing: 90 days for testing/inspection/acceptance, plus 30 days for notification, total 120 days. Acceptance and Inspection: Acceptance at destination Inspection at origin Acceptance at destination Evaluation Factors: The government will evaluate quotations based on: Price Past Performance Supplier Performance Risk (DFARS 252.204-7024) End of provision. Options: Up to 100% increase in quantity within 365 days, exercised via unilateral option with FAR Clause 52.217-6. Indicate if the Contracting Officer may exercise the 100% option: Yes ____ or No ____. Request variations in your quote if needed. Scope This contract includes requirements for manufacturing and quality for the LEAD, TEST, O2 SENSOR. Applicable Documents Includes MIL-STD-130, MIL-DTL-19595, and related drawings and references. Requirements Designated Cage Code(s): 53711, 6915273 Marking in accordance with MIL-STD-130, REV N, 16 NOV 2012 Production Lot Approval required Design changes require prior approval and documentation Non-Magnetic Inspection per MIL-DTL-19595 Notification 30 days prior to shipment for testing Quality Assurance Inspection responsibility and rights Compliance assurance Record keeping for 365 days Production Lot Test at specified location Packaging In accordance with the schedule and MIL-STD 2073. Notes Information sources and document access details Distributors' authorization proof required Distribution statement codes explained Material Certification (C of C) submission required for FA and PLT materials Additional Links: See Solicitation N0010426QXB91 See Solicitation N0010426QXB910001

View original listing