Opportunity
SAM #W56ZLW26Q0021
Army Solicitation: Stratasys Origin Two and F370CR 3D Printers with Turnkey Installation and Training for Fort Hood, TX
Buyer
0418 AQ HQ CONTRACTING SUP
Posted
July 30, 2026
Respond By
July 31, 2026
Identifier
W56ZLW26Q0021
NAICS
333248, 333249, 541512
This procurement opportunity from the Department of the Army seeks a turnkey additive manufacturing solution for Fort Hood, TX, to enable rapid, on-demand production of high-precision replacement parts. - Government Buyer: - Department of the Army - 13th Air Command and Staff College (ACSC), 418th CSB CSS, and 0418 AQ HQ Contracting Support, Fort Hood, TX - OEMs and Vendors: - Stratasys (OEM for all requested 3D printers and systems) - Products Requested: - Stratasys Origin Two Polymer 3D Printer (1 unit) - Part number: Stratasys Origin Two / 0001 - Industrial-grade programmable photopolymerization (P3/DLP) printer - Includes UV post-processing cure box, ultrasonic cleaning system, and startup polymer resins - Stratasys F370CR Composite 3D Printer (1 unit) - Part number: Stratasys F370CR / 0002 - Industrial-grade FDM printer for carbon-fiber-reinforced thermoplastics - Includes automated soluble support cleaning system, startup carbon-fiber and TPU spools, and spare extrusion head - Services Requested: - OEM-certified on-site installation, configuration, and calibration for both printers - Manufacturer-led operator training (2-5 days) after installation and operational verification - Provision of proprietary software licenses (GrabCAD Print, Streamline Pro) with multi-user or lifetime access - Initial consumables and startup materials for both systems - Comprehensive 12-month manufacturer-authorized commercial warranty and technical support - Unique/Notable Requirements: - Brand-name (Stratasys) restriction for compatibility with Army digital engineering workflows - OEM authorization required for all equipment and services - Compliance with unique item identification requirements - All services and training must be performed by Stratasys or authorized partners - Turnkey delivery: systems must be fully operational upon installation
Description
This requirement is for a turnkey additive manufacturing solution to establish an organic capability for producing replacement parts at Fort Hood, TX. The acquisition includes two specific industrial-grade 3D printers, along with all necessary services for immediate and sustained operation:
- Stratasys Origin Two (Polymer Printer): An industrial-grade 3D printer utilizing programmable photopolymerization (P3/DLP) technology. It must have a minimum build volume of 192 mm x 108 mm x 370 mm and be capable of producing high-accuracy end-use parts with complex geometries
.- Stratasys F370CR (Composite-Ready Printer): An industrial-grade Fused Deposition Modeling (FDM) 3D printer specifically designed for producing composite parts. It must have a minimum build volume of 355 x 254 x 355 mm and be capable of printing with high-strength, carbon fiber-reinforced thermoplastics.
The requirement also includes turnkey installation, configuration, and calibration of all equipment; manufacturer led on-site training for operators; all necessary software licenses and initial consumables; and a comprehensive warranty and technical support package. Training shall be scheduled and conducted only after the printer has been fully installed, calibrated, and verified as operational. Training includes but not limited to system operation, job setup, maintenance, and troubleshooting.
All questions must be submitted in writing to the POCs listed below no later than 10:00 am (CST), 31 July 2026. komlan.e.dougah.mil@army.mil