Opportunity
Rocky Mount Civicplus #320-140726FD
Rocky Mount NC – Old Mill Road Sewer Pump Station Force Main Construction
Posted
July 28, 2026
Respond By
August 27, 2026
Identifier
320-140726FD
NAICS
237110, 237990
The City of Rocky Mount, North Carolina, is seeking bids for the construction of the Old Mill Road Sewer Pump Station Force Main project. - Government Buyer: - City of Rocky Mount, Purchasing Office - Contact: Fantashia Dickens - Project Scope: - Installation of approximately 2,800 linear feet of 14-inch PVC C900 (DR-21) force main - 100 linear feet of 14-inch ductile iron force main - 210 linear feet of 14-inch restrained joint ductile iron force main - 1,005 linear feet of 14-inch inside diameter directional bore (rock), using fusible PVC pipe - 70 linear feet of 30-inch diameter steel casing (bored and jacked) - 4 sewer air release valves - 2 14-inch diameter plug valves with boxes - 3,500 compact ductile iron fittings - 150 cubic yards of rock excavation (contingency) - Products/Materials Requested: - PVC C900 (DR-21) pipe, ductile iron pipe, fusible PVC pipe, steel casing, ductile iron fittings, plug valves, and air release valves - Unique/Notable Requirements: - Directional drilling through rock and steel casing installation by bore and jack method - Compliance with minority- and women-owned business enterprise (W/MBE) participation goals (10%) - Adherence to North Carolina Department of Transportation standards for utility crossings - Proper contractor licensing under North Carolina law - Erosion and sedimentation control, restoration of disturbed areas, and compliance with detailed technical specifications - No specific OEMs are named, but materials must meet industry and regulatory standards - Project duration is 150 days for substantial completion, with liquidated damages for delays
Description
This solicitation is for the construction of the Old Mill Road Sewer Pump Station Force Main in Rocky Mount, North Carolina. The work includes installation of approximately 3,110 linear feet of 14-inch force main piping using PVC and ductile iron, directional drilling, steel casing installation, sewer air release valves, rock excavation as needed, erosion control, and all related work to complete an operational force main system. The project duration is expected to be 150 days. A pre-bid meeting is scheduled for August 5, 2026, and bids are due by August 27, 2026.