Opportunity

Fresno Unified School District Procureware #22-48

Fresno USD Asphalt Pavement Rehabilitation – Multiple School Sites (Award)

Posted

April 06, 2022

Respond By

May 04, 2022

Identifier

22-48

NAICS

238990

Fresno Unified School District has awarded contracts for comprehensive asphalt pavement rehabilitation at multiple school sites across the district. - Government Buyer: - Fresno Unified School District, Purchasing Department - OEMs and Vendors: - Flex Crax by Asphalt Coatings Engineering (crack fill material) - Vulcan Power Patch by Vulcan Materials Company (crack fill/patch material) - Awarded contractors: Tosted Asphalt, Inc. and Doug Ross, Inc. dba Central Valley Asphalt - Products and Services Requested: - Removal and replacement of asphalt concrete pavement - Concrete curb and sidewalk replacement - Installation of signs and wheelstops - Crack filling using Flex Crax and Vulcan Power Patch - Application of seal coat (minimum 3 coats: two squeegee, one spray) - Pavement striping, including USA map striping at playcourts - Sitework including demolition, grading, and preparation - Temporary fencing/barricades for public safety - Removal and reinstallation of sports equipment (volleyball and tennis nets) - Notable Requirements: - No substitutions allowed for specified products/materials (as listed in Exhibits A-1/A-2) - Compliance with California prevailing wage laws - Contractor registration with the Department of Industrial Relations - Mandatory prequalification for bidders - Unit costs specified for additional asphalt work (play court and parking lot, per sq ft) - Builder's risk insurance required - Awards made by site and section, with contract values ranging from approximately $138,000 to $319,400 per site/section

Description

The Fresno Unified School District is soliciting sealed bids for Bid No. 22-48, Sections A-C, for Asphalt Pavement Rehabilitation at Various Sites – Group 1. The project involves removing and replacing asphalt concrete pavement, concrete curb and sidewalk, signs and wheelstops; installing crack fill, seal coat, pavement striping, and all other related sitework. The project requires compliance with prevailing wage laws and contractor registration with the Department of Industrial Relations. A mandatory pre-bid conference and job walk are scheduled, and contractors must be prequalified prior to bidding. The bid consists of 16 projects awarded by line item, with bids submitted via the District's online portal.

View original listing