Opportunity

Saskatchewan Tenders #HWY-H26088-APPN

Culvert Replacement and Installation on Highway 5, Saskatchewan

Posted

July 21, 2026

Respond By

August 17, 2026

Identifier

HWY-H26088-APPN

NAICS

237310, 237990

This opportunity involves a culvert replacement project on Highway 5 northwest of Wadena, Saskatchewan, managed by the Ministry of Highways (Saskatchewan): - Government Buyer: - Ministry of Highways, Saskatchewan - Products and Materials: - Two polymer laminated corrugated steel pipe culverts, 1800 mm diameter, 25 meters each (total 50 meters) - Polymer laminated standard annular corrugated couplers (2 units) - Polymer laminated end stiffeners (2 units) - Granular base course: 360 tonnes - Asphalt concrete: 60 tonnes - Random Riprap Type II: 90 cubic meters - Silt fence: 100 meters (supplied and installed) - Erosion control blanket: 350 square meters (supplied and installed) - Seeding: 350 square meters - Granular backfill: 450 cubic meters - Services: - Removal and disposal of an existing wood pile bridge (1.83 m rise x 3.05 m span x 22.8 m length) - Installation of the two culverts by open excavation - Unique/Notable Requirements: - The Ministry will supply the main culvert materials; the contractor is responsible for installation and all other works - Early completion is required, with a shortened advertising period - No specific OEMs or vendors are named in the notice - OEMs: - No specific manufacturers are identified, but the culverts must be polymer laminated corrugated steel pipe meeting specified dimensions and standards

Description

This is an advance notice for the procurement of a Contractor to complete a culvert replacement on Highway 5 northwest of Wadena, Saskatchewan. The procurement involves the supply and installation of two 1800 mm diameter polymer laminated corrugated steel pipe culverts by open excavation of the roadway for a total length of 50 meters. The work is expected to take place as early as August 2026, with a specified completion date as early as October 31, 2026. The Ministry of Highways reserves the right to not proceed with advertising this work. The contractor will also be responsible for removal and disposal of a wood pile bridge, granular base course, asphalt concrete, riprap, silt fence, erosion control blanket, seeding, and granular backfill.

View original listing