Opportunity

SAM #W50S7G26QA012

Replacement of Bard HVAC Units for 139th Mission Support Group

Buyer

U.S. Army National Guard

Posted

July 29, 2026

Respond By

August 13, 2026

Identifier

W50S7G26QA012

NAICS

811310, 238220

This opportunity involves the replacement of HVAC units at the 139th Mission Support Group: - Government Buyer: - DEPT OF DEFENSE, DEPT OF THE ARMY, NATIONAL GUARD BUREAU - JFHQ USPFO MO, USPFO MO PROCUREMENT (139th Mission Support Group) - OEMs and Vendors: - Bard (Original Equipment Manufacturer for both existing and replacement HVAC units) - Products/Services Requested: - Replacement of seven (7) Bard exterior wall mount HVAC units - Existing units: Bard WA372-A15, 3.0 Ton Air Conditioner - Replacement units: Bard W36AF-A15, 3.0 Ton Air Conditioner (7 units) - Full-service contract including: - Demolition and removal of old units - Installation of new Bard units - Sealing of wall penetrations to ensure water-tightness - Cleanup and repair of any construction-related damage - Unique/Notable Requirements: - Only Bard HVAC models are specified for both removal and installation - Contractor must haul off old units and restore any affected property - Project is set aside for small businesses (NAICS 811310) - Estimated project value between $25,000 and $100,000 - Contract duration is 90 days after notice to proceed, including inspection and punch list

Description

The 139th Mission Support Group contracting office intends to issue a Request for Quote (RFQ) to award a single firm fixed-price contract for services, non-personal, to provide all plant, labor, transportation, materials, tools, equipment, appliances and supervision necessary for the AATTC HVAC project including Replace existing seven (7) Bard exterior wall mount HVAC units with new. Existing units – Bard WA372-A15 3.0 Ton Air Conditioner B) New units – Bard W36AF-A15 3.0 Ton Air Conditioner 2) Contractor is responsible for providing all needed equipment and labor needed to demo existing and install new. A) Old units to be hauled off base by contractor. 3) Contractor is responsible for ensuring all wall penetrations are sealed and water-tight. 4) Contractor is responsible for the clean-up and removal of all debris and unused material. No leftover material is to be left on base unless directed by Base CE. 5) The contractor is responsible for repairing any damage to existing buildings, sidewalks, asphalt/concrete drives, curbs, grass areas, fencing, utility line/boxes and all other government property that occur as a result from construction. A) Grass areas will be free of ruts and re-seeded as needed.The contract duration will be 90 days after notice to proceed to include inspection and punch list. This project is set aside 100% for small businesses. The North American Industry Classification System (NAICS) Code is 811310, with a small business size standard of $13,000,000. The magnitude of construction is between $25,000 and $100,000. 

Please be advised that this notice is published solely to inform industry of the Government’s intent to solicit quotations directly from 139th AW contracting office. The Government does not intend to post a formal solicitation notice on SAM.gov for coordinators or brokers to quote.

View original listing