Opportunity
SAM #W9128F26QA074
Zebra Mussel Mitigation System Design and Installation at Gavins Point Project
Buyer
USACE Northwestern Division Endist Omaha
Posted
July 28, 2026
Respond By
August 31, 2026
Identifier
W9128F26QA074
NAICS
237990, 237110
This opportunity seeks a contractor to design and install a zebra mussel mitigation system for the U.S. Army Corps of Engineers at the Gavins Point Project in Crofton, Nebraska. - Government Buyer: - U.S. Army Corps of Engineers, Omaha District - OEMs and Vendors: - No specific OEMs or vendors are named in the solicitation - Products/Services Requested: - Design and installation of a zebra mussel abatement system - Supply and installation of two local tank skids with spill containment pallets - Two pump skids for chemical distribution - Power supply for distribution pumps and ancillary equipment - Integration with existing raw water flow meters - All labor, equipment, and materials required for a complete system - Unique or Notable Requirements: - Project is set aside for Small Businesses under NAICS 237110 (Water and Sewer Line and Related Structures Construction) - Estimated construction cost is between $250,000 and $500,000 - Work must be completed within 210 calendar days after Notice to Proceed - Place of performance is Gavins Point Project, Crofton, NE
Description
The U.S. Army Corps of Engineers, Omaha District, hereby announces the solicitation for ?Gavins Point Raw Water Intake Zebra Mussel Mitigation?. The solicitation will close on 31 August 2026. The solicitation is restricted to Small Businesses. A Site Visit is scheduled and additional information regarding the site visit is provided in the solicitation via FAR Clause 52.236-27. The site visit is scheduled for 05 August 2026. The scope of this project is to design a zebra mussel abatement system to protect the powerhouse raw water intakes and intake piping. The contractor will supply all labor, equipment, and materials for installation of a new zebra mussel mitigation system. Significant features of this design include installation of two local tank skids and integral spill containment pallets, installation of two pump skids for distribution, power supply to distribution pumps and ancillary distribution system equipment, and interfacing of distribution pumps with existing raw water flow meters. The Contractor will be required to commence work upon receipt of contract award and complete the work 210 calendar days after receipt of Notice to Proceed, this is subject to change after solicitation issuance. The estimated construction cost of this project is between $250,000 and $500,000. The Primary North American Industry Classification System (NAICS) code for this solicitation is 237110 ? Water and Sewer Line and Related Structures Construction, with a size standard for Small Business of $45M. The Contracting Office is USACE Omaha District, located at 616 Capital Ave, Omaha, NE 68102. All questions pertaining to this solicitation shall be submitted on ProjNet (ProjNet access, and additional guidance are contained within the solicitation). The place of performance is Gavins Point Project, Crofton, NE 68730. Additional Links:Department of Defense Procurement ToolboxPIEE Solicitation Module Link for W9128F26QA074Registration Instructions for the PIEE Solicitation ModuleWeb Based Training for the PIEE Solicitation Module