Opportunity
Saskatchewan Tenders #346-2026
Buffalo Pound Provincial Park Watermain Replacement Project
Posted
October 04, 2023
Respond By
August 18, 2026
Identifier
346-2026
NAICS
237110
This opportunity from SaskBuilds and Procurement seeks contractors for a major water infrastructure upgrade at Buffalo Pound Provincial Park. - Government Buyer: - Government of Saskatchewan, SaskBuilds and Procurement - Project Scope: - Supply and installation of approximately 7.5 km of 200 mm diameter DR11 HDPE potable water main - Replacement of existing asbestos cement water main - Installation via Horizontal Directional Drilling (HDD) - Includes all associated appurtenances: - Isolation valves - Air release and combination air valve chambers - Pressure reducing valve chambers - Drains, fittings, joint restraints - Water service connections - Full site preparation, excavation, shoring, backfilling, and restoration - Utility locating and connection to existing water distribution system - Hydrostatic pressure and leakage testing, disinfection, flushing, and commissioning - Site cleanup, restoration, and warranty corrections - Products/Services Requested: - 7.5 km of 200 mm DR11 HDPE potable water main (no specific OEM or part number specified) - Comprehensive installation and commissioning services - Unique/Notable Requirements: - Use of HDD for installation - Replacement of asbestos cement pipe - Full system testing, disinfection, and commissioning - Restoration and warranty work - No specific OEMs or vendors are named in the solicitation.
Description
The project involves the supply and installation of approximately 7.5 km of 200 mm diameter DR11 HDPE potable water main using Horizontal Directional Drilling to replace the existing asbestos cement water main. The work includes installation of associated appurtenances such as isolation valves, air release chambers, pressure reducing valve chambers, drains, fittings, joint restraints, and water service connections. Site preparation activities, excavation, shoring, backfilling, restoration, utility locating, and connection to the existing water distribution system are also included. Additionally, hydrostatic pressure and leakage testing, disinfection, flushing, commissioning, site cleanup, restoration, and warranty corrections are part of the scope. The completion date is March 24, 2027.