Opportunity
SAM #FA461026QFSUP
Repair and Reinstallation of Kidde FM 200 ECS Fire Suppression Tank Cylinder at Vandenberg SFB
Buyer
30th Contracting Squadron
Posted
July 28, 2026
Respond By
August 05, 2026
Identifier
FA461026QFSUP
NAICS
811310
This opportunity involves the repair and reinstallation of a Kidde FM 200 ECS Fire Suppression Tank Cylinder at Vandenberg Space Force Base: - Government Buyer: - U.S. Space Launch Delta 30, 30 Civil Engineer Squadron, and 30th Contracting Squadron at Vandenberg Space Force Base, Department of the Air Force - OEM Highlight: - Kidde is the specified Original Equipment Manufacturer (OEM) for the FM 200 ECS Fire Suppression Tank Cylinder - Products/Services Requested: - Removal, repair, recharge, and reinstallation of one Kidde FM 200 ECS Fire Suppression Clean Agent Gas Tank Cylinder (part number: Kidde FM 200 ECS) - Services include disconnecting, transporting to an authorized facility, valve assembly inspection and repair, refilling with clean agent, leak testing, reinstallation, re-arming, and system testing - Quantities: - One (1) Kidde FM 200 ECS Fire Suppression Tank Cylinder - Unique/Notable Requirements: - All work must comply with EPA, OSHA, NFPA, and Title 49 CFR standards for environmental, safety, and transportation compliance - Contractor must minimize disruption to facility operations and ensure protection of sensitive electronic equipment - Strict adherence to federal, state, and local regulations, including base security and environmental protocols - Small business set-aside under NAICS 811310 - Period of Performance: - 365 days after award; work to be performed during standard business hours, excluding federal holidays
Description
Quotes are due NLT 2:00 PM PDT on 5 August 2026
The contractor must provide all personnel, equipment, and services to disconnect, remove, repair, recharge, and reinstall one discharged Kidde FM 200 ECS Fire Suppression Clean Agent Gas Tank Cylinder located at Building 8339 on Vandenberg Space Force Base, California. The scope includes transporting the cylinder to an authorized off-site facility to inspect the tank, rebuild the valve assembly, refill it with the clean agent chemical, and perform leak testing. Upon reinstallation, the contractor must re-arm and test the system to ensure full operational capability while protecting the facility's electronic equipment. All work must be completed in strict compliance with federal, state, and local environmental and safety standards, including NFPA guidelines and base security requirements. See the Performance Work Statement (PWS) for more information about the requirement.