Opportunity

Georgia Procurement Registry #PE-66400-NONST-2027-000000017

Bridge Repair on Slate Mine Road at Pine Log Creek for Gordon County, GA

Posted

July 27, 2026

Respond By

September 03, 2026

Identifier

PE-66400-NONST-2027-000000017

NAICS

237310, 237990

Gordon County Board of Commissioners is seeking qualified contractors for bridge repair on Slate Mine Road at Pine Log Creek. - Scope of work includes: - Concrete repair: locating reinforcing steel, saw cutting, removing deteriorated concrete, and installing patch material - Bridge painting: cleaning and repainting beams (4,708 sq ft) - Adding 60 tons of rip-rap as directed by the engineer - Cleaning and resealing 78 linear feet of deck joints - Realigning bearings and repairing 2 anchor bolts - Removing drift and providing traffic control, mobilization, and a portable changeable message sign - Contractors must submit shop drawings for repair procedures (stamped by a Georgia Professional Engineer or with sufficient detail for county review) - All work must comply with Georgia DOT standards and provided specifications/plans - Notable requirements: - Multiple bonds: bid, performance, payment, and a specialized bridge bond with a 7-year warranty - Mandatory pre-bid meeting, contractor qualifications, non-collusion and E-Verify affidavits, and insurance certificates - No specific OEMs or vendors are named; opportunity is open to all qualified contractors

Description

The Gordon County Board of Commissioners is soliciting sealed bids from qualified contractors for the repair of the bridge on Slate Mine Road at Pine Log Creek. The scope includes repairing concrete by locating existing reinforcing steel and embedments, saw cutting concrete, removing deteriorated concrete or patch material, installing concrete patch material, bridge painting (cleaning and repainting beams), adding rip-rap as directed, cleaning and resealing deck joints, and realigning bearings/repairing anchor bolts. All work must comply with specifications, plans, and engineering directions. The project requires commencement within 30 days of Notice to Proceed and completion within 180 days.

View original listing