Opportunity
Little Elm Ionwave #2026-09 Addendum 2 (Big Leaf Water Line Improvements Project)
Bigleaf Water Line Improvements Project – Design and Construction
Posted
June 03, 2026
Respond By
June 25, 2026
Identifier
2026-09 Addendum 2 (Big Leaf Water Line Improvements Project)
NAICS
237110, 237990
This opportunity involves the Town of Little Elm, Texas seeking proposals for the Bigleaf Water Line Improvements Project. - Government Buyer: - Town of Little Elm, Texas (Denton County) - Project Scope: - Final design and construction of approximately 1,400 linear feet of 24-inch water transmission line from Mansell Pump Station through Bigleaf Drive to a connection near FM 423 - Design and installation of a new parallel 8-inch water line - Transfer of water services from the existing 20-inch line to the new 8-inch line - Full panel replacement for any disturbed pavement, following Town standard details - Products/Services Requested: - 24-inch water transmission line (approx. 1,400 linear feet) - 8-inch water line (new installation) - Pavement panel replacement (as needed) - Final design services for water lines - Notable Requirements: - All materials must be on the Town’s approved list; no specific domestic requirements for iron and steel - Adherence to updated technical addenda and specific construction methods for curbs and pavement - Incentives for early substantial completion; penalties for delays not under contractor control - No specific OEMs or vendors are named in the solicitation
Description
The Town of Little Elm, Texas is requesting proposals for the construction of the Bigleaf Water Line Improvements Project. The project includes the final design of approximately 1400 linear feet of 24-inch water transmission line from the Mansell Pump Station through Bigleaf Drive to a connection near the intersection of Bigleaf Drive and FM 423. Additionally, a new parallel 8-inch water line will be designed, and water services will be moved from the existing 20-inch water line to the proposed 8-inch water line. The project also involves full panel replacement for disturbed pavement utilizing the Town's standard details.