Opportunity

CanadaBuys #AB-2026-05269

Town of High Level seeks bids for rehabilitation of 100 Avenue and related infrastructure work

Posted

July 23, 2026

Respond By

August 06, 2026

Identifier

AB-2026-05269

NAICS

237310, 237990, 237130

The Town of High Level, Alberta, is seeking bids for a comprehensive rehabilitation project on 100 Avenue and related infrastructure: - Government Buyer: - Town of High Level, Alberta - Project Scope: - Rehabilitation of 100 Avenue (99 Street to 103 Street), settlement repairs at various locations, and potential work on Bjornson Avenue - Includes cold milling, asphalt paving, concrete sidewalk, curb and gutter, sanitary and storm sewer replacement, service connections, storm sewer installation, lighting, line painting, and related construction - Products and Quantities: - 1,000 m² topsoil and sod - 7,600 m² cold milling asphalt pavement - 200 m³ subgrade excavation - 1,600 tonnes granular base course - 2,800 tonnes asphalt concrete pavement - 455 m monolithic concrete sidewalk - 700 m curb and gutter - 1,955 m² area concrete - 6 catch basin maintenance holes - 305 m storm sewer main pipes (various diameters) - 6 sanitary maintenance holes - 420 m sanitary sewer main pipe (various diameters) - 13 sanitary services - 400 m abandoned sewer lines with fillcrete - 710 m directional drilling for power - 22 light poles (double and single davit) - 38 luminaires - 1 fire hall signal - 2 pedestrian signals - Unique/Notable Requirements: - Project divided into three schedules (A, B, C) - 10% bid bond required - Tender documents available via Alberta Purchasing Connection - No specific OEMs or brands named in the solicitation - Contract Duration: - 12 months, with completion targeted for September 15, 2027

Description

The Town of High Level is soliciting bids for the rehabilitation of 100 Avenue, which includes cold milling, asphalt concrete pavement, monolithic sidewalk, curb and gutter, sanitary sewer replacement, service connections, storm sewer, luminaires, line painting, and related work. The project is divided into three schedules covering different areas and repair works. The contract duration is 12 months with a construction completion date of September 15, 2027. A pre-tender meeting is scheduled, and a bid bond of 10% of the tendered amount is required.

View original listing