Opportunity
SAM #W50S8A26QA035
Interior Office Renovation for DCMA at Pease Air National Guard Base
Buyer
USPFO New Hampshire ANG
Posted
July 24, 2026
Respond By
August 21, 2026
Identifier
W50S8A26QA035
NAICS
236210, 236220, 238310, 238290
This opportunity involves a full interior renovation of office space in Building 145 at Pease Air National Guard Base, Newington, NH, for the Defense Contract Management Agency (DCMA). - Government Buyer: - U.S. Army National Guard, USPFO Activity NHANG, Contracting Office at Pease ANGB - New Hampshire Air National Guard, Pease Air National Guard Base, Building 145 - Scope of Work: - Complete interior renovation of DCMA office space - Includes framing, drywall (900 sqft), wall insulation (400 sqft), ceiling tiles (600 sqft), ceiling grid repairs (300 sqft), carpet (600 sqft), cove base (160 linear feet), drywall painting (1250 sqft), new wall section with office door, and HVAC return duct installation - Reinstallation of facility infrastructure: electrical outlets, switches, lighting, fire alarm devices, conduits, junction boxes, panels, network drops, plumbing, thermostats, sensors, HVAC supply/returns, and other utilities to code-compliant locations - Products/Materials Requested: - Drywall: 900 sqft, 5/8-inch fire rated type-x gypsum - Mineral wool fire-resistant insulation: 400 sqft, minimum R value 15 - Ceiling tiles: 600 sqft, 2x4, matching existing manufacturer and surface texture, certified for indoor air quality - Carpet tiles: 600 sqft, continuous filament nylon 6.6 or nylon 6, low VOC adhesives - Vinyl cove base: 160 linear feet, matte finish, low VOC adhesive - Paint: Sherwin Williams Pro Mar 200 Eggshell or equivalent, 1250 sqft - Metal stud wall framing and new office door: 12 linear feet - HVAC return duct: one 8-inch duct - Unique/Notable Requirements: - All work must comply with federal and local regulations - All materials must meet specified fire, air quality, and environmental standards (e.g., low VOC adhesives, fire-rated drywall, certified ceiling tiles) - Contractor must provide all plant, labor, transportation, materials, tools, equipment, and supervision - Performance bonds required - Set aside 100% for small businesses under NAICS 236210 (Industrial Building Construction) - No specific OEMs or brand names are mandated, but Sherwin Williams is referenced as an equivalent standard for paint - No vendors or resellers are named; all technical details are in the attachments
Description
The notice constitutes a Request for Quotation (RFQ), Solicitation W50S8A-26-Q-A035, to renovate office space in B145 at Pease Air National Guard Base (PEASE ANGB) in Newington, NH. The Government seeks to award a single firm fixed price contract for services, non-person, to provide all plant, labor, transportation, materials, tools, equipment, and supervisors as needed.
The anticipated contract duration shall be approximately 90 days. Please refer to the attached specifications and drawings included in this solicitation. Also be sure to review the attached SF1442 for a complete listing of the applicable provisions and clauses. Please note that the Government is setting this requirement as a total 100% small business set-aside under the North American Industrial Classification System (NAICS) 236210 (Industrial Building Construction) with a size standard of $45.0M. The associated PSC code is Z2AA.
Interested parties shall provide the quotes to the Government by the closing date and time specified in this solicitation and in box 13 of the SF1442. All quotes shall be emailed to the points of contact listed in this posting.
This solicitation also constitutes a notice of site visit which the Government will hold on 5 August 2026 at 10:00AM (EST). Please review 00 21 00 for instructions and submission requirements for site access before the event.
In accordance with FAR 36.211(b), the following information is provided:
(1) The National Guard has no agency-specific policies or procedures applicable to definitization of equitable adjustments for change orders under construction contracts other than those described at FAR 43.204, DFARS 243.204 and AFARS 5143.204.
(2) Data for the prior 3 fiscal years regarding the time required to definitize equitable adjustments for change orders under construction contracts for the National Guard is currently not available but will be compiled and provided in future announcements.
All requests for information (RFIs) are due no later than the date specified in para 4.3 of section 00 21 00 of the SF 1442.
NOTE: Funds are not presently available for this requirement IAW FAR 52.232-18. Funding shall be made available at the time of award.