Opportunity

PIEE #W9128F26RA107

Repair and Replacement of Mass Parking Apron Section V at Minot Air Force Base

Buyer

USACE Northwestern Division Endist Omaha

Posted

July 21, 2026

Respond By

August 20, 2026

Identifier

W9128F26RA107

NAICS

237310, 237990, 238910

This opportunity is for the repair and replacement of Mass Parking Apron Section V at Minot Air Force Base, North Dakota, managed by the U.S. Army Corps of Engineers, Omaha District. - Government Buyer: - U.S. Army Corps of Engineers, Omaha District (W071 ENDIST OMAHA) - Scope of Work: - Remove and replace the entire Mass Parking Apron Section V in multiple phases - Establish a uniform apron width across the project area - Construct new temporary asphalt concrete (ACC) transitions to connect new portland cement concrete (PCC) pavement to existing pavement - Grade adjacent turf areas to improve drainage - Mill existing asphalt shoulders and stockpile the material - Estimated Construction Cost: - Between $25,000,000 and $35,000,000 - Products/Services Requested: - Construction services for apron repair and replacement (no specific OEMs, part numbers, or products listed) - Unique/Notable Requirements: - Compliance with UFC 3-260-01, Chapter 6 (Airfield and Heliport Planning and Design) - Submission of Material Safety Data Sheets (MSDS) with offers - No specific OEMs or vendors are named in the solicitation - Design-bid-build delivery method will be used - Project will be executed over several years

Description

Repair/Replace Mass Parking Apron Section V at Minot Air Force Base, Minot, North Dakota. The solicitation will close after 30 days. The solicitation is restricted to Small Businesses. Project Description: This project will be executed using a design-bid-build project delivery method. The entire Mass Parking Apron will be removed and replaced in multiple sections over the course of several years. The existing MPA was originally constructed under two separate contracts. For unknown reasons, the first constructed eastern half is 5’ narrower than the western half south of the MPA centerline taxiway (335’ vs. 340’). This project will establish a uniform MPA width of 340’ south of the MPA centerline taxiway. Due to slight changes in finished top of pavement grades between the new MPA Section(s) pavement and the existing MPA pavement to remain, a new temporary ACC transition will be required to connect new MPA Section(s) PCC pavement to existing MPA PCC pavement. Limited grading of turf areas adjacent to new ACC shoulder pavement to improve surface drainage away from paved shoulder edges (Provide 1-1/2” drop-off at edge per UFC 3-260-01, Chapter 6). Existing asphalt shoulders required to be removed will be milled by the Contractor and stockpiled for Minot AFB use at a later date at the location shown on the drawings. Estimated Construction Costs: The estimated construction cost of this project is between $25,000,000 and $35,000000.

View original listing