Opportunity
PIEE #FA486126Q0018
Mini Split HVAC System Upgrade and Installation at Nellis Air Force Base
Buyer
FA4861 99 CONS LGC
Posted
July 23, 2026
Respond By
August 18, 2026
Identifier
FA486126Q0018
NAICS
238220, 238210, 238290
This opportunity involves a comprehensive HVAC system upgrade and installation at Nellis Air Force Base, managed by FA4861 99 CONS LGC. - Government Buyer: - FA4861 99 CONS LGC, Nellis Air Force Base, Nevada - Products/Services Requested: - Construction and installation of two maintenance pads for condensing units - Installation of screen block walls and weatherproof maintenance receptacles - Core drilling and PVC pipe installation for ICD 705 compliance - Insulation of line sets and extensive electrical work (including panel EDH 1 3, 480/277V, 800 amps) - Generator backup integration and weatherproof disconnects for condensing units - Installation of new cassette type HVAC systems: - 1 ton system for Room 112 (with separate controller) - 2 ton systems for Rooms 113 and 114 (each with separate controller) - 4 ton system for Room 132 (with separate controller) - Unique/Notable Requirements: - All work must comply with International Building Code, UFC standards, DOD instructions, Nellis ID2 standards, Clark County, Nevada, and federal codes and laws - No specific OEMs or part numbers are specified - Set aside for Total Small Business - Period of Performance: - 160 days for installation and testing
Description
Construct and install two maintenance pads to house all condensing units and provide single line as built drawings, install a two sided screen block at the front of the building matching the existing CMU block color and style, use solid and vented CMU blocks to ensure sufficient airflow around all condensing units, and build screen block walls two rows higher than the condensing units; the contractor shall supply a weatherproof 120V maintenance receptacle for each pad, core drill the existing wall of Building 119, install a 3 inch PVC pipe sealed with acoustical seal to maintain ICD 705 compliance per Tech Spec 1.5.1, install insulation on all line sets entering Building 119, run all electrical from Room 119’s electrical mechanical room using panel EDH 1 3 rated at 480/277V and 800 amps, tie all new HVAC systems to the existing generator for backup power, surface mount electrical conduits in Room 119 and the exterior HVAC yard, run conduits underground to each maintenance pad, and supply a weatherproof disconnect for each condensing unit; the contractor shall install new cassette type HVAC systems in Rooms 112, 113, 114, and 132 using the existing suspended ceiling grid with added support, provide a 1 ton HVAC system with a separate controller for Room 112, provide 2 ton HVAC systems with separate controllers for Rooms 113 and 114, and provide a 4 ton HVAC system with a separate controller for Room 132; all design and construction shall comply with the current International Building Code, UFC standards, all applicable public laws, executive orders, CFR requirements, DOD instructions and directives, Nellis ID2 standards, and Clark County, Nevada, and federal codes and laws, and any discrepancies between codes or standards and contract documents shall be immediately reported to the Contracting Officer, with the more stringent requirement applying unless otherwise directed. 26 WPS request this HVAC installation and testing be accomplish within, 160 days, period of performance. Proposals will be evaluated using lowest price, technically acceptable. A site visit will take place on 8/4/2026 at 0830 AM PDT, meeting in front of building 119 main entrance. Please ensure your base pass request has been submitted to me by 2PM PDT on 7/24/2026 if you do not have base access to Nellis AFB to ensure you have access by the date of the site visit. Proposals are due by 8/18/2026 at 2:00 PDT. Answers will be provided via a solicitation amendment.