USDA NRCS Texas – Remedial Repairs for Cedar Creek Watershed Dams 16 & 16A

Buyer

FPAC Business Center Acquisition Division

Posted

July 23, 2026

Respond By

August 25, 2026

Identifier

12FPC326Q0043

NAICS

237990

This opportunity seeks construction services for remedial repairs at Cedar Creek Watershed Sites 16 and 16A in Rockwall County, Texas, managed by the USDA Natural Resources Conservation Service (NRCS) Texas State Office. - Government Buyer: - United States Department of Agriculture (USDA), Natural Resources Conservation Service (NRCS), Texas State Office - Local partners: Rockwall Commissioners Court, Kaufman Van Zandt Soil and Water Conservation District - Scope of Work: - Remedial repairs to two high hazard earthen dams (Sites 16 and 16A) - Upstream wave berm repairs, excavation, earthfill, and topsoiling - Placement and anchoring of geotextile fabric (Class I non-woven, Material Spec 592) - Installation of rock riprap (ASTM D6092 R-150 and R-300, Material Spec 523) - Backfilling, vegetation establishment, and fence removal/reconstruction (Material Spec 591) - Principal spillway pipe repairs at Site 16A, including: - Removal and replacement of 42-inch I.D. reinforced concrete pressure pipe (A.W.W.A. C-301) - Installation of reinforced concrete cantilever pipe support and cradle - Sand filter collar installation (ASTM C33 fine aggregate) - Products/Materials Requested: - 42-inch I.D. reinforced concrete pressure pipe (1 x 20 ft, 2 x 10 ft sections) - Rock riprap (approx. 10,649 cubic yards across both sites) - Geotextile fabric (approx. 5,814 square yards at Site 16A) - Earthfill (approx. 9,500 cubic yards total) - Structural concrete, steel reinforcement, galvanized steel (ASTM A123) - Field fencing and barbed wire fencing - Services Requested: - Mobilization/demobilization, water removal, pollution control, construction surveys, contractor quality control - Clearing, grubbing, seeding, mulching, and traffic control - Unique/Notable Requirements: - All work must comply with detailed USDA-NRCS specifications and ASTM standards - Contractor must provide all labor, materials, equipment, and supervision - Project is set aside for small businesses under NAICS 237990 - Compliance with federal anti-discrimination and DEI requirements - Aggregated award for both sites; bidders must price all items - Estimated Value: - Between $1,000,000 and $5,000,000

Description

This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12.  This announcement constitutes the only solicitation.  Quotations are being requested and a separate written solicitation will not be issued. 

Solicitation number 12FPC326Q0043 is issued as a Request for Quotation (RFQ) for Cedar Creek Watershed 16 and 16A Remedial Repairs.

The upstream wave berm repair for both Sites 16 and 16A will consist of stripping and stockpiling the topsoil from the embankment eroded area; performing excavation and earthfill activities to achieve the specified rock riprap subgrade; placing and anchoring geotextile fabric on the approved subgrade; placing rock riprap to the required thickness and limits as shown in the construction drawings; backfilling the toe of the rock riprap with earthen materials; blending the earthwork above the rock riprap into the existing embankment; establishing vegetation; and removing and reconstructing fence as shown on the construction drawings.

The existing plunge basins for both sites have experienced erosion along the side slopes of the basin and outlet channel. To prevent/retard future erosion, the basins will be armored with a blanket of rock riprap.

[Site 16A only] Plunge basin erosion has also caused damage to the principal spillway pipe in the vicinity of the pipe outlet. Repair of this damage includes excavating embankment material from around the damaged pipe sections; removing and reconstructing the damaged pipe cantilever, pipe support, and concrete cradle; replacing approximately 40 ft. of the damaged spillway pipe at the outlet; installing a new sand filter collar around a portion of the replaced pipe sections; and reconstructing the earthen embankment in this vicinity.

This acquisition  is set-aside for small business concerns.  The applicable North American Industry Classification Standard Code is 237990, Other Heavy and Civil Engineering Construction.  The small business size standard is 45M.  This acquisition is a Total Small Business Set-Aside.  All responsible sources may submit a quotation which will be considered by the agency. 

The contractor shall furnish all labor, materials, equipment and supervision required to construct the project at outlined in statement of work and detailed in the specifications, drawings, and plans attached hereto.

Magnitude of Requirement: Between $1,000,000 and $5,000,000

A site showing will be held on August 6, 2026, at 10:00am ET.  Attendees will meet at USDA Service Center, 8620 FM 741, Forney Texas 75126. Questions will not be answered at the site visit. The visit is strictly a walk through, any/all questions shall be submitted in writing to Contract Specialist, Blake Boyer, blake.boyer@usda.gov no later than August 13, 2026, at 4PM Eastern Time. Please include the solicitation name and number as the subject line of the email.

Please see the attached document(s) for complete details.