Opportunity
SAM #FA813726R0046
Comprehensive Facility Renovation and Range Upgrades at Tinker AFB Shooting Range B1024
Buyer
AFSC PZIOC
Posted
July 23, 2026
Respond By
August 14, 2026
Identifier
FA813726R0046
NAICS
236220, 238190, 238990, 236210, 238110, 238130
Tinker Air Force Base is seeking comprehensive construction and renovation services for a shooting range facility (B1024), with a focus on structural, architectural, mechanical, and electrical systems. - Government Buyer: - Tinker Air Force Base, U.S. Air Force, 72nd Air Base Wing, Engineering Support - Key Products and Materials: - Fire-resistant 3/4" plywood and 2x4 sleepers for wood baffle replacement (per UFC 4-179-02 Small Arms Ranges) - Fire-resistant wood column wraps (2x8 and 2x10) - Water repellent finish for all exposed wood - 3/8" thick AR500 steel plates (ASTM E10-08/MIL-A-A46100) for column reinforcement - Extensive list of construction materials: concrete, masonry, structural steel, steel joists, steel decks, cold-formed metal framing, rough and finish carpentry, insulation, waterproofing, roofing, doors, windows, wall panels, flooring, signage, HVAC, plumbing, electrical, fire protection, and more - Services Requested: - Demolition and deconstruction (including safe removal, utility disconnection, salvage, and debris management) - Installation of new structural, architectural, and mechanical systems per detailed technical specifications - Specialized services: firestopping, joint sealants, fire alarm and detection systems, HVAC commissioning, earthwork, paving, fencing, irrigation, seeding, sodding, and more - Compliance with extensive industry standards (ASTM, ACI, AISC, AWS, NFPA, UL, etc.) and government facility standards (UFC, TAFB Fire Protection Standard) - Unique/Notable Requirements: - All wood baffles and bracing must be replaced with fire-resistant materials and sealed for weather protection - Damaged steel columns require AR500 steel plate reinforcement - Strict adherence to fire protection, safety, and environmental standards - Contractor qualifications: NICET certifications for fire protection systems, licensed landscape architect for irrigation, and certified corrosion experts for cathodic protection - Mandatory submittals, shop drawings, quality control, and warranty provisions (some up to 20 years) - No government-furnished property; work to be performed during normal duty hours - OEMs: - AR500 (for steel plate material) - Monaco Enterprises (required for fire alarm control units) - ProtecTar, Star Seal (as specified for pavement sealers) - Quantities and Part Numbers: - 3/8" AR500 steel plate (ASTM E10-08/MIL-A-A46100), quantity as needed for column repair - Fire-resistant plywood, sleepers, and wraps: quantities per site requirements - Numerous other materials and components as detailed in technical specifications - Scope: - The project encompasses full-scale facility renovation, including demolition, new construction, system upgrades, and site improvements, with detailed requirements for every building system and trade discipline.
Description
This posting is for Tinker AFB - MAC BOA Holders ONLY.
Project Solicitation Number: FA813726R0046
Project Title: WWYK260036 - Replace Wood on Baffles, B1024 Project Location: Tinker AFB - B1024
Replace all existing wood cladding and bracing at the shooting range B1024 - TAFB
Project specific documents are attached to this posting.
If you experience any difficulty at receiving or access to the project specific documents, send an email request to Contracting Points of Contact listed. In the email, please provide email addresses for Prime Contractor ONLY points of contact. Do not include any Sub-Contractor email addresses.
Currently, the Solicitation – Request for Proposal (RFP) is in the draft stage and will be posted once available.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
After review of the project specific documents, if you are a Tinker AFB – MAC BOA Holder, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit. Your RSVP email must be received by Wednesday, 29 July 2026 2:00 PM CT. In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP the Entry Access List (EAL) so that we can know how many personnel require base access.
You must attend the Initial Site Visit for the project to be considered eligible to propose.
Current date and time for site visit is 31 July 2026, 9:00 AM CT - 10:00 AM CT
Location: Building 1024