Opportunity

Richland School District 2 Opengov #26-2704

Turnkey Irrigation Well Pump System Replacement at Blythewood High School

Posted

July 23, 2026

Respond By

August 06, 2026

Identifier

26-2704

NAICS

238220, 238290

This opportunity is for the turnkey replacement of the irrigation well pump system at Blythewood High School, managed by Richland School District Two's Support Services - Operations department. - Government Buyer: - Richland School District Two, Support Services - Operations - Products and Equipment Requested: - Vertical turbine pump (1 unit) - 250 GPM capacity, 224 feet total dynamic head - Bronze or cast iron pump bowl assembly, bronze enclosed impellers, stainless steel pump shaft, steel column pipe, rubber or bronze lineshaft bearings, cast iron vertical hollow shaft discharge head - Factory-tested for irrigation water service - Vertical hollow shaft electric motor (1 unit) - 20 HP, 1800 RPM, three-phase, compatible with the pump - Neoprene gasket (1 unit) - 6-inch size, 1/8-inch thickness, full face style, 150# pressure rating - Services Requested: - Complete turnkey project including: - Removal of existing irrigation well pumping equipment - Installation of new pump and motor - Crane services, startup, alignment, testing, commissioning - Disposal of removed materials and restoration of disturbed areas - Coordination with district personnel - Unique/Notable Requirements: - Bidders must verify all existing conditions and dimensions prior to bidding - All labor, materials, equipment, permits, and testing are to be included - Award will be made to the lowest responsive and responsible bidder - No specific OEMs or brands are mandated; alternate makes/models may be proposed if specified - Project is classified under NIGP code 67017 (Irrigation Systems, Supplies, Parts, and Accessories)

Description

This solicitation seeks competitive bids for the replacement of the irrigation well pump at Blythewood High School. The project includes all labor, supervision, materials, equipment, tools, transportation, permits, testing, startup, commissioning, cleanup, and disposal of materials. Bidders must verify existing conditions and submit bids by August 6, 2026. A mandatory pre-bid conference is scheduled for July 28, 2026, at the project site.

View original listing