Opportunity

New Brunswick Opportunities Network #21586

Alma Shoulder Reconstruction Project – Construction and Materials Procurement

Posted

July 22, 2026

Respond By

August 06, 2026

Identifier

21586

NAICS

237310, 237990

The Municipality of Fundy Albert is seeking bids for the Alma Shoulder Reconstruction project on Scenic Drive in Alma, New Brunswick. - Government Buyer: - Municipality of Fundy Albert - Director of Operations: Ian Barrett - Project Scope: - Reconstruction of existing roadway shoulder - Installation of erosion control structures and riprap-lined ditches - Addition of new catch basin (750mm), shoulder drain (100mm corrugated HDPE storm sewer pipe), and new paved asphalt shoulders - Modifications to local drainage infrastructure, including lowering and adjusting catch basins, redirecting cross culverts, and removal of existing catch basin - Traffic control measures, including signage, devices, barricades, and personnel - Use of geotextile fabric, sediment control fencing, and random riprap for stabilization and erosion control - Products/Materials Requested (with estimated quantities): - Common excavation (80 cu.m) - Ditching (93 m) - Borrow material (120 tonnes), including Borrow "A" (40 tonnes) - Backfill for structures (40 tonnes), Class "A" backfill - Aggregate base/subbase (20 tonnes), 31.5 mm rock (70 tonnes) - Shoulder material (40 tonnes), 31.5mm rock (70 tonnes) - Warm asphalt mix "D" and installation (40 tonnes) - Storm sewer pipe, 100mm corrugated HDPE (76 m) - Precast catch basin, 750mm (1 each) - Adjustment of catch basins and manholes (1 each) - Removal of existing catch basin (1 each) - Geotextile Type N2 (210 sq.m) - Sediment control fence (80 m) - Erosion control structures, Type "B" (2 each) - Random riprap, R5 (130 tonnes) - Mobilization and demobilization (1 lump sum) - Unique/Notable Requirements: - No specific OEMs or brands mandated for materials or equipment - Bidders must provide a 10% bid bond or certified cheque - Performance security and 10% holdback on progress payments required - Certificate of Recognition (COR) required if bid exceeds $100,000 - Project must be completed within four consecutive weeks, with substantial completion by the specified deadline - Liquidated damages of $1,000 per working day for late completion - Work hours restricted to weekdays 7:00 AM–7:00 PM, weekends/holidays 8:00 AM–5:00 PM

Description

The Municipality of Fundy Albert is soliciting bids for the Alma Shoulder reconstruction project on Scenic Drive. The work involves reconstruction of the existing roadway shoulder, addition of erosion control structures, riprap lined ditches, a new catch basin, shoulder drain, and new paved asphalt shoulders. It also includes modifications to local drainage infrastructure such as lowering catch basins and redirecting existing cross culverts. Bids must be submitted digitally by August 6, 2026, and must include a bid bond or certified cheque of 10% of the bid price including HST.

View original listing