Opportunity

North Carolina eVP #345-07/22/2026

Engineering Services for Wrightsville Beach Waterline Replacement Project

Posted

July 22, 2026

Respond By

August 27, 2026

Identifier

345-07/22/2026

NAICS

541330

This opportunity seeks engineering firms to support the Wrightsville Beach Waterline Replacement Project for the Cape Fear Public Utility Authority (CFPUA) in Wilmington, NC. - Government Buyer: - Cape Fear Public Utility Authority (CFPUA) - Procurement managed by Ben Guerrieri, Procurement Manager - Scope of Work: - Survey, design, permitting, and construction support for approximately 2,100 linear feet of new 16-inch water main - Replacement of existing 8-inch asbestos cement water line along Salisbury Street, with new main along Pelican Drive - Maintain existing water main in service during construction - Preparation of design drawings, easement maps, detailed specifications, and traffic control plans - Subsurface utility engineering (SUE) and utility locating - Bidding assistance and construction phase services (may be awarded later) - Notable Requirements: - Experience with water distribution projects in active urban environments - Compliance with North Carolina's Mini Brooks Act for professional services - Coordination with the Division of Water Infrastructure (DWI) due to State Reserve funding - Specific insurance coverage levels required - No specific OEMs or product vendors are named, as this is a professional engineering services solicitation.

Description

The Cape Fear Public Utility Authority (CFPUA) is seeking an engineering firm experienced with survey, design, permitting, and construction services for the Wrightsville Beach Waterline Replacement project. The project involves constructing approximately 2,100 linear feet of new 16-inch water main along Pelican Drive to replace the existing 8-inch asbestos cement water line along Salisbury Street, while keeping the existing water main active during construction. The selected consultant will provide engineering services including design, permitting, survey, utility locating, preparation of bidding documents, and construction phase support. Funding for the project is from State Reserve and coordination with the Division of Water Infrastructure (DWI) is required. The solicitation requires submission of a Statement of Qualification by August 27, 2026, and electronic bids are not permitted.

View original listing