Opportunity
SAM #1240LT26Q0049
Mesa Falls Boardwalk and Bench Reconstruction – USDA Forest Service
Buyer
USDA Forest Service
Posted
July 23, 2026
Respond By
August 25, 2026
Identifier
1240LT26Q0049
NAICS
237990, 237310, 321213, 321912
This opportunity is for the reconstruction of the Mesa Falls Boardwalk in the Caribou-Targhee National Forest, Idaho, managed by the USDA Forest Service Region 4. - Government Buyer: - USDA Forest Service, Region 4 (Utah Acquisition Support Center, Caribou-Targhee National Forest, Ashton/Island Park Ranger District) - Products and Materials Requested: - 3.5"x9.5" Parallam wood beams or equivalent (11,756 board feet) - 3.5"x9.5"x12" Parallam wood beam spacers or equivalent (2,919 board feet) - 3"x6" pressure-treated wood decking (27,184 board feet) - 2"x14" stair stringers (741 board feet) - 5/8" galvanized hex head bolts with nuts and malleable washers - Replacement of six 6-foot redwood benches and connecting hardware - Rough carpentry, heavy timber construction, wood patio decking, structural glued-laminated timber, and wood stains/finishes - Services Requested: - Mobilization and selective demolition of existing boardwalk - Removal and replacement of boardwalk and benches - Compliance with environmental, quality control, and Buy American Act requirements - Adherence to Davis Bacon wage determinations and provision of performance/payment bonds - Unique/Notable Requirements: - All existing metal railings, posts, anchors, and supports must be reused - No weather-related extensions allowed; strict on-site work window - 100% small business set-aside under NAICS 237990 - No specific OEMs or proprietary brands are mandated, but Parallam beams (a product of Weyerhaeuser) or equivalent are specified - Estimated contract value is between $250,000 and $500,000
Description
The work includes removing and disposing of old pressure-treated lumber. Replacing all lumber with comparable stringers, deck boards, and other lumber as well as connecting hardware. Existing metal railings, posts, anchors, and other supports will remain in-place to be re-used. Redwood Bench lumber and connecting hardware will also be replaced for the 10 benches along the boardwalk and asphalt pathways.