Opportunity
SAM #19AS2026Q0020
Driveway, Stormwater Drainage, and Electrical Conduit Rehabilitation at U.S. Embassy Canberra
Buyer
U.S. Embassy Canberra
Posted
July 23, 2026
Respond By
August 06, 2026
Identifier
19AS2026Q0020
NAICS
812930, 237310, 237110, 237990
This opportunity involves the rehabilitation of the Deputy Chief of Mission Residence (DCMR) driveway and stormwater drainage system at the U.S. Embassy Canberra. - Government Buyer: - U.S. Department of State, U.S. Embassy Canberra, GSO Procurement - Scope of Work: - Stormwater drainage investigation, repair, and upgrade (pipes, pits, channels, trench drains, kerbs) - Removal and replacement of deteriorated asphalt pavement (minimum 50 mm compacted thickness) - Subgrade and base course rehabilitation (removal of unsuitable materials, supply and compaction of new base) - Replacement of stone edging with 150 mm wide concrete kerbs - Entrance apron asphalt works - Full site restoration (landscaping, irrigation, lighting, utilities) - Additional work: Supply and installation of approximately 12 linear meters of 50 mm heavy-duty electrical conduit beneath the driveway, including excavation, trenching, and restoration - Products/Materials Requested: - Asphalt pavement - Concrete kerbs - Stormwater drainage infrastructure - Subgrade and base course materials - 50 mm heavy-duty electrical conduit (approx. 12 meters) - Site restoration materials and services - Services Requested: - Comprehensive construction services including labor, supervision, equipment, permits, coordination, testing, and quality control - Unique/Notable Requirements: - Contractor must provide all labor, materials, equipment, and permits - All disturbed areas must be restored to original condition - The residence will be unoccupied during construction - Work must begin within 10 days of notice to proceed and be completed within 75 days - No specific OEMs or part numbers are identified in the solicitation.
Description
DCMR Driveway and Stormwater Drainage Rehabilitation. Work includes stormwater drainage investigation, repair, and upgrade; full removal and replacement of deteriorated asphalt pavement (minimum 50 mm compacted thickness); subgrade and base course rehabilitation; replacement of existing stone edging with 150 mm concrete kerbs; entrance apron asphalt works; and full site restoration of landscaping, irrigation, lighting, and utilities. The contractor shall furnish all labor, materials, equipment, and miscellaneous costs required to complete the installation as specified herein..
Please refer to Section B for the detailed Statement of Work.