Opportunity

Chino Planet bids #SD231

City of Chino Catch Basin Trash Capture Retrofit Project (SD231) – Installation of Certified Connector Pipe Screen Systems

Posted

July 13, 2026

Respond By

August 06, 2026

Identifier

SD231

NAICS

237990

The City of Chino Public Works Department is seeking a contractor for the Catch Basin Trash Capture Retrofit Project (SD231), focused on stormwater pollution prevention and regulatory compliance. - Government Buyer: - City of Chino, Public Works Department, Engineering Division - Project Scope: - Retrofit 274 storm drain catch basins with certified Connector Pipe Screen (CPS) systems - CPS devices must be certified full capture systems listed by the California State Water Resources Control Board - All CPS components must be fabricated from grade 304 stainless steel, with 14 gauge mesh, and designed for vector control abatement - Site preparation includes pressure washing and vacuum cleaning of all 274 catch basins prior to installation - Creation of GIS attribute files and photo documentation for each catch basin, including facility ID, GPS coordinates, installation dates, and technician information - Implementation of traffic control and temporary signage per the latest WATCH manual, with detailed traffic control and pedestrian detour plans - Contractor must possess a valid California Class A contractor’s license and comply with prevailing wage laws - Unique/Notable Requirements: - Strict compliance with California trash capture regulations and City of Chino Standard No. 350 - All CPS devices must be removable for maintenance and structurally robust - Detailed documentation and coordination with utilities required - Liquidated damages of $800 per day for avoidable delays - No specific OEMs are named, but only certified manufacturers/distributors of full capture systems are eligible for the CPS devices

Description

This project involves supplying all labor, materials, and equipment to perform site preparation including pressure washing and vacuum cleaning of 274 storm drain catch basins. The contractor will install 274 storm drain catch basin connector pipe screen systems, create GIS attribute files, provide photo documentation, and manage traffic control and temporary signage. The work must comply with the Trash Provisions adopted by the California State Water Resources Control Board. The contractor must hold a valid California Class A contractor's license throughout the contract period.

View original listing