Farm Creek Irrigation Company is seeking bids for the Farm Creek Canal Rehabilitation project in Roosevelt, Duchesne County, Utah. - Buyer: Farm Creek Irrigation Company (with Jones & DeMille Engineering, Inc. as issuing office) - Project scope: - Installation of approximately 13,900 linear feet of 42-inch HDPE DR 32.5 irrigation pipe - Associated appurtenances: air release valves, drain valves, turnouts (4-inch to 12-inch), and flow meters for both turnouts and mainline - Retrofitting and improving three downstream locations to support increased pressure - The project is divided into two contracts: - Schedule 1: Main Pipeline (estimated at $2,400,000) - Schedule 2: Existing Pipeline Improvements (estimated at $250,000) - No specific OEMs are named; the solicitation is open to qualified contractors with experience in large-diameter HDPE pipeline construction - Notable requirements: - Electronic bid document submission - Adherence to specified file upload size limits - Pre-bid conference scheduled - All work must comply with the technical specifications provided in the bid documents
Description
Farm Creek Irrigation Company is soliciting bids for the construction of the Farm Creek Canal Rehabilitation project. The work includes installation of approximately 13,900 linear feet of 42-inch HDPE DR 32.5 irrigation pipe with associated appurtenances such as air release valves, drain valves, turnouts, and flow meters. The project is divided into two contracts: Schedule 1 Main Pipeline and Schedule 2 Existing Pipeline Improvements, with expected completion by March 22, 2027. Bidding documents are available electronically from Jones & DeMille Engineering, and a pre-bid conference will be held on July 29, 2026.