Opportunity

SAM #N0038326RDA26

Repair and Overhaul of Navy Replacement Parts (Pump, Dehydrator Cartridge, Clock, Radome) for NAVSUP WSS Philadelphia

Buyer

NAVSUP WEAPON SYSTEMS SUPPORT

Posted

July 22, 2026

Respond By

August 06, 2026

Identifier

N0038326RDA26

NAICS

334417, 811219, 332994, 811310

NAVSUP Weapon Systems Support (WSS) Philadelphia is seeking repair, overhaul, upgrade, testing, and inspection services for critical replacement parts used by the Department of the Navy. - Government Buyer: - Department of Defense, Department of the Navy, NAVSUP Weapon Systems Support (NAVSUP WSS) Philadelphia - OEMs Highlighted: - Raytheon Company - AGM Container Controls Inc. - Products/Services Requested: - Pump Unit, Centrifugal (part number 4102AS0503-7, NSN 4320 017107754) - Cartridge, Dehydrator (part number 679650-002, NSN 4440 017109043) - Clock, Master Regulator (part number 4102AS4260-1, NSN 6645 017109142) - Radome (part number 4102AS7200-100, NSN 1560 017109143) - Services include repair, overhaul, upgrade, testing, and inspection to Ready For Issue (RFI) condition - Notable Requirements: - All work must use OEM technical drawings and publications - Compliance with ISO 9001/SAE AS9100 quality standards is mandatory - Use of SAE-AS22759 series wire instead of MIL-W-81381 - Contractor must maintain a configuration management plan and process control documentation - All repairs must be performed at the contractor's facility - All parts and materials must be new unless otherwise approved - Procedures required for items deemed Beyond Economical Repair (BER) or Missing on Induction (MOI)

Description

CONTACT INFORMATION 4 N721.08 B1E 771-229-0426 jillian.a.eder.civ@us.navy.mil ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023) 19 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT 8 X INSPECTION AND ACCEPTANCE OF SUPPLIES 26 X STOP-WORK ORDER (AUG 1989) 1 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023) 16 INVOICE AND RECEIVING REPORT COMBO TYPE N/A TBD N00383 TBD TBD See Schedule TBD NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18) 1 MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE 1 INTEGRITY OF UNIT PRICES (NOV 2021) 1 WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003) 6 12 months 60 days after discovery of defect SAFEGUARDING SENSITIVE CONVENTIONAL ARMS, AMMUNITION, AND EXPLOSIVES (NOV 2023) 9 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026) 4 TRANSPORTATION OF SUPPLIES BY SEA (OCT 2024) 2 BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024) 11 SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026) 7 BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024) 5 BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024) 1 ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026) 13 ROYALTY INFORMATION (APR 1984) 1 TYPE OF CONTRACT (DEV 2026-O0045)(MAR 2026) 1 NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, AND ENERGY PROGRAM USE (APR 2008) 2 ONLY ONE OFFER (DEVIATION 2026-O0048)(MAR 2026) 1 All contractual documents (i.e., contracts, purchase orders, task orders, delivery orders, and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein. Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor’s facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt, and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in this contract. Required RTAT: ## ____ days after receipt of asset. Throughput Constraint: The contractor must provide a throughput constraint for each NSN(s). Total assets to be repaired monthly after initial delivery commences: X/month (contractor fill in #). A throughput of ##____ per month reflects no throughput constraint. Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bilateral agreement between the Contractor and NAVSUP WSS Contracting Officer. Reconciliation: A reconciliation modification will be issued after final inspection and acceptance of all assets inducted under this contract. The parties have agreed to a price (shown on the schedule page) for each unit at the negotiated RTAT. Such prices are based on the Contractor meeting the RTAT requirements described within the schedule page. If the Contractor does not meet the applicable RTAT requirement, consideration will be assessed and subject to negotiation. 1. Scope Articles to be furnished hereunder shall be repaired, tested, and inspected in accordance with the terms and conditions specified in the Requirements Section of this document. Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. The use of MIL-W-81381 wire in any item to be delivered under this procurement is prohibited. The prohibition applies notwithstanding any reference to MIL-W-81381 wire that may be made in any of the drawings or specifications for this procurement. SAE-AS22759 series wire shall be used in lieu of MIL-W-81381 wire, in any place where MIL-W-81381 wire is cited. Any questions should be directed to the Procuring Contracting Officer. If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C. Personnel performing tasks in accordance with IPC/EIAJ-STD-001C shall be trained and certified as required by paragraph 5.1.4 of IPC/EIAJ-STD-001C. 2. Applicable Documents - Not Applicable 3. Requirements 1.0 General 2.0 Definitions 3.0 Scope Details of the scope, repair requirements, and procedures follow, structured similarly with appropriate HTML tags for clarity and readability.

View original listing