Opportunity
SAM #W9128F26RA107
Repair and Replacement of Mass Parking Apron Section V at Minot Air Force Base
Buyer
USACE Northwestern Division Endist Omaha
Posted
July 21, 2026
Respond By
August 20, 2026
Identifier
W9128F26RA107
NAICS
237310, 237990, 238910
This opportunity seeks contractors for a major airfield infrastructure project at Minot Air Force Base: - Government Buyer: - US Army Corps of Engineers, Omaha District (DEPT OF DEFENSE.DEPT OF THE ARMY.US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION NORTHWESTERN.ENDIST OMAHA) - Project Scope: - Repair and replacement of Mass Parking Apron Section V - Design-bid-build delivery method - Full removal and replacement of the apron in multiple sections over several years - Establishment of a uniform apron width - Construction of new temporary ACC transitions - Limited grading of adjacent turf areas to improve drainage - Milling and removal of existing asphalt shoulders for stockpiling - Notable Requirements: - Opportunity is restricted to Small Businesses - No specific OEMs, vendors, or part numbers are identified in the solicitation - Estimated construction cost is between $25,000,000 and $35,000,000 - No specific products or equipment brands are mandated, allowing for a range of construction material suppliers and subcontractors
Description
Repair/Replace Mass Parking Apron Section V at Minot Air Force Base, Minot, North Dakota. The solicitation will close after 30 days. The solicitation is restricted to Small Businesses. Project Description: This project will be executed using a design-bid-build project delivery method. The entire Mass Parking Apron will be removed and replaced in multiple sections over the course of several years. The existing MPA was originally constructed under two separate contracts. For unknown reasons, the first constructed eastern half is 5 ft narrower than the western half south of the MPA centerline taxiway (335 ft vs. 340 ft). This project will establish a uniform MPA width of 340 ft south of the MPA centerline taxiway. Due to slight changes in finished top of pavement grades between the new MPA Section(s) pavement and the existing MPA pavement to remain, a new temporary ACC transition will be required to connect new MPA Section(s) PCC pavement to existing MPA PCC pavement. Limited grading of turf areas adjacent to new ACC shoulder pavement to improve surface drainage away from paved shoulder edges (Provide 1-1/2 inch drop-off at edge per UFC 3-260-01, Chapter 6). Existing asphalt shoulders required to be removed will be milled by the Contractor and stockpiled for Minot AFB use at a later date at the location shown on the drawings. Estimated Construction Costs: The estimated construction cost of this project is between $25,000,000 and $35,000000. Additional Links:Department of Defense Procurement ToolboxPIEE Solicitation Module Link for W9128F26RA107Registration Instructions for the PIEE Solicitation ModuleWeb Based Training for the PIEE Solicitation Module