Opportunity

Maryland Procurement Portal #BPM058041

Light Rail Fiber Optic Cable Replacement and Pathway Construction for Maryland Transit Administration

Posted

July 13, 2026

Respond By

September 07, 2026

Identifier

BPM058041

NAICS

237130

This opportunity involves the Maryland Transit Administration's plan to upgrade its Light Rail communications infrastructure: - Government Buyer: Maryland Transit Administration (MTA) - Project Scope: - Construction of new pathways and installation of a replacement fiber optic cable for the existing 84 strand cable - Route covers Hamburg Station to North Avenue Maintenance Facility - Ensures connectivity between instrument houses, traction power substations, station equipment cabinets, and the Operations Control Center (OCC) - Technical Requirements: - Splicing into an existing 144 strand aerial fiber optic cable - Installation of drop cables through specified pathways - Termination of fiber strands and comprehensive end-to-end testing - The old 84 strand cable will remain as a backup; no reconfiguration of current fiber or equipment is needed - No specific OEMs or vendors are named in the solicitation - No unique product brands or part numbers are specified; the focus is on installation and integration services - Notable: The project is strictly for infrastructure replacement and does not require removal or reconfiguration of existing systems

Description

This contract involves the construction of pathways and installation of fiber optic cable from Hamburg Station to the North Avenue Maintenance Facility to establish communications connectivity between various instrument houses, traction power substations, station equipment cabinets, and the Operations Control Center (OCC). The existing 84 strand fiber optic cable, which connects all locations, has reached its end of life and must be replaced. The contractor is responsible for splicing into the existing 144 strand aerial cable, installing drop cables through pathways, terminating strands, and testing the fiber optic strands end to end. The existing fiber optic cable will remain in place and in use as a backup, and reconfiguration of existing fiber and equipment is not included in this contract.

View original listing