Opportunity
North Carolina eVP #1025BR2026SW
Sidewalk Construction and Utility Adjustments for Bermuda Run Drive and Riverbend Drive (Phases 1 & 2)
Posted
July 20, 2026
Respond By
August 11, 2026
Identifier
1025BR2026SW
NAICS
237310
The Town of Bermuda Run in Davie County, North Carolina, is seeking bids for the construction of a 1.7-mile sidewalk along Bermuda Run Drive and Riverbend Drive, combining Phases 1 and 2 into a single contract. - Government Buyer: - Town of Bermuda Run, Davie County, North Carolina - Scope of Work: - Construction of sidewalk, including grading, drainage, and utility adjustments - Erosion control, traffic control, and environmental protection measures - Compliance with 2024 North Carolina Department of Transportation (NCDOT) Standard Specifications - Coordination with local utilities and property owners - Protection of existing landscaping and strict erosion control - Products and Materials Requested: - Major construction materials: concrete sidewalk (4,450 SYD), concrete curb & gutter (3,431 LFT), drainage pipes (various sizes and materials), aggregate base, asphalt, geotextiles, handrails, and signage - Erosion control supplies: silt fence (5,360 LFT), wattles, flocculant, seeding and mulching (9 acres) - Utility items: water pipe (1,100 LFT of 2" PVC), fire hydrant relocation, force main sewer, manholes, valves - Services Requested: - Grading, excavation, clearing, and grubbing - Temporary traffic control (signs, flaggers, barriers) - Construction surveying - Environmental and erosion control response - Notable Requirements: - Adherence to ADA guidelines and all state/local standards - Compliance with North Carolina general contracting laws (Chapter 87) - Mandatory bid bond and performance/payment bonds - No electronic bids accepted; strict submission instructions - Liquidated damages for delays; restrictions on lane closures during holidays/events - OEMs and Vendors: - No specific OEMs or manufacturers are named; standard construction materials and products are specified by type and standard - Period of Performance: - Phase 1 starts upon purchase order; Phase 2 begins at a later specified date - Both phases must be completed by a set deadline, with liquidated damages for late completion
Description
The Town of Bermuda Run is seeking bids for construction of a sidewalk along a 1.7-mile stretch of Bermuda Run Drive and Riverbend Drive in Bermuda Run East. Phases 1 and 2 have been combined into one project for the purpose of this solicitation. The work includes grading, drainage, and sidewalk construction. Electronic bids are not permitted; submissions must follow instructions outlined in the attachments.