Opportunity

South Orange County Community College District (SOCCCD) Planet bids #15057-2026

Communication Vault Replacement and Temporary Fiber Installation at Saddleback College

Posted

July 21, 2026

Respond By

September 03, 2026

Identifier

15057-2026

NAICS

238210, 238290, 237130, 238190

This opportunity is for the Communication Vault Replacement and Temporary Fiber Installation Project at Saddleback College, managed by the South Orange County Community College District. - Government Buyer: - South Orange County Community College District (SOCCCD) - Project location: Saddleback College, Mission Viejo, California - OEMs and Vendors: - Sumitomo (air blown fiber systems; installation must be by a Sumitomo-certified installer) - Products/Services Requested: - Temporary cable/fiber installation to maintain IT and fire alarm connectivity during vault replacement - Removal of existing copper multipair cable - Temporary connection to fire alarm control panels - Removal of OM1 air blown fiber - Replacement of a 2U FDU cabinet with a 4U FDU cabinet - Removal of existing air blown fiber conflicting with vault replacement - Unique/Notable Requirements: - Prime contractor must hold a B-General Contractor or C-10 Electrical license - Air blown fiber work must be performed by a Sumitomo-certified installer (Sumitomo highlighted as key OEM) - Compliance with prevailing wage rates and strict workplace policies (smoke-free, no-gift certifications) - Liquidated damages of $300 per day for project delays - All bid documents must be submitted electronically - Estimated contract value: $1,275,000 - Contract duration: 120 calendar days

Description

This solicitation is for the Communication Vault Replacement - Temporary Fiber Installation Project at Saddleback College. The project involves installing temporary fiber to maintain the campus network during the removal and installation of the future Vault Replacement Project. The scope includes providing temporary cable/fiber connections, removing existing copper multipair cable, connecting fire alarm control panels temporarily, removing OM1 air blown fiber, replacing a 2U FDU cabinet with a 4U FDU cabinet, and removing existing air blown fiber that conflicts with the vault replacement. The project requires a prime contractor with a B-General Contractor or C-10 Electrical license, and air blown fiber work must be done by a Sumitomo-certified installer. The estimated contract value is $1,275,000 with a duration of 120 calendar days.

View original listing