Opportunity
Temecula Planet bids #PW19-13
Temecula Fire Station 73 Apparatus Bay and Gym Construction Solicitation
Posted
July 20, 2026
Respond By
August 19, 2026
Identifier
PW19-13
NAICS
236220, 238290
The City of Temecula Department of Public Works is seeking bids for the construction of a new apparatus bay and gym at Fire Station 73. - Government Buyer: - City of Temecula, Department of Public Works - Project Scope: - Construction of an 897 sq ft gym and a 2,217 sq ft apparatus bay with attached shop/storage - Demolition of existing concrete and structures - Accessibility improvements, ADA-compliant restrooms and showers - Complete plumbing, mechanical, and electrical systems - Installation of HVAC equipment and LED lighting fixtures - Exterior improvements: new concrete parking lot, storm drainpipe, lighting, trash enclosure, landscaping, and fully automatic irrigation system - Soil improvement using stone columns or approved equal, per geotechnical recommendations - Products/Services Requested: - Automatic irrigation system (pipe, valves, controllers, flow meters, accessories) - Plant materials (trees, shrubs, groundcovers, turf, soil amendments, mulch) - Concrete and masonry materials (slabs, footings, CMU walls, reinforcing steel) - Electrical lighting fixtures (LED, controls) - HVAC equipment (units, ductwork, controls) - Fire protection systems (sprinkler and alarm systems) - Doors and windows (hollow metal, aluminum storefront, roll-up doors) - Trash enclosure materials (CMU walls, steel posts, wire mesh, wood trellis) - Notable Requirements: - Design/build contracts for fire sprinkler, fire alarm, and geotechnical soil improvement systems (contractors responsible for design, permitting, and fees) - Minimum 50% self-performance by the awarded contractor - Adherence to 2022 California building codes and geotechnical report - Coordination with multiple engineering firms - 20-year warranty on certain materials (roofing, metal finishes), 1-year general warranty, 90-day plant establishment for landscaping - No specific OEMs or vendors are named in the solicitation.
Description
This project involves furnishing all materials, equipment, tools, labor, and incidentals required to construct a new fire station apparatus bay and gym. The scope includes concrete demolition, construction of a new 897 square foot gym, a new 2,217 square foot apparatus bay and shop/storage building, accessibility improvements, finishes, plumbing, mechanical, electrical work, and exterior improvements such as a concrete parking lot, storm drainpipe, lighting, trash enclosure, and landscaping with irrigation. Soil improvement with stone columns or approved equal is required prior to construction. The project requires a Class B license and has an estimated value of $4,035,000 with a duration of 180 working days.