NIH Seeks Installation of Custom Equipment Protection Shields for Laboratory Equipment

Buyer

NIH Office of Logistics and Acquisition Operations

Posted

July 20, 2026

Respond By

July 30, 2026

Identifier

75N98026Q00835

NAICS

332999, 238390

The National Institutes of Health (NIH) is seeking a contractor to install custom equipment protection shields for laboratory equipment in Building 10, Tenth Floor, B & N Corridor. - Government Buyer: - National Institutes of Health (NIH) - Office of Logistics and Acquisition Operations (OLAO) - Products/Services Requested: - Sixteen (16) custom equipment protection shields - Purpose: Safeguard laboratory equipment from water and leak damage - No specific OEMs, brands, or part numbers specified - Installation and thorough testing of all shields - Includes onsite assessment to ensure proper fit - Must comply with NIH Fire Code policies - Unique/Notable Requirements: - Contractor must have experience with NIH facilities - Shields must be custom-fitted to equipment and location - Installation aims to prevent research disruptions and equipment damage due to recurring flooding - Emphasis on maintaining a stable research environment

Description

Requirements:

SCOPE: The requested service under this contract is to install sixteen (16) equipment protection shields in Building 10, Tenth Floor, B & N Corridor. The installation of these protective shields will help safeguard valuable laboratory equipment from potential water and leak damage. Over the past several months, building 10 has experienced multiple flooding and leak-related incidents that have negatively impacted laboratory operations and placed critical research equipment at risk. 

Installing these equipment protection shields will improve the overall efficiency and continuity of laboratory operations by acting as a protective barrier against water damage. This will help prevent interruptions to research activities, reduce the need for costly equipment repairs, and ensure uninterrupted scientific progress. In addition, the shields will help maintain a stable and protected research environment, ensuring the reliability and accuracy of experimental work within Building 10, Tenth Floor, B & N Corridor. 

Please see the attached Proposal # 260644 for further details. 

BACKGROUND INFORMATION: The contractor has previously provided protective shielding installations for various institutes across NIH, including the National Institute of Child Health and Human Development (NICHD). NICHD selected this contractor due to its strong reputation for providing precise and reliable installations that protect sensitive laboratory equipment. The contractor conducts onsite assessments to obtain accurate measurements and ensure all installations meet the strict operational requirements of NIH facilities. In addition, the contractor strictly adheres to all applicable NIH Fire Code policies during each installation. 

Building 10 has experienced recurring leaks and flooding issues for many years, resulting in damage to laboratory equipment and disruptions to important research activities. By utilizing the contractor’s protective shielding products, the laboratory equipment located within the Tenth Floor B & N Corridor can be better protected against future water-related incidents. 

This proactive solution will help preserve valuable scientific equipment, minimize downtime, protect research integrity, and allow laboratory operations to continue without interruption. 

PURPOSE AND OBJECTIVES OF THE ACQUISITION: The purpose of the installation of the equipment protection shields is to protect valuable lab equipment from water damage and improve the progress of lab work. Additionally, the shields will assure the dependability and accuracy of experimental results by establishing an operational laboratory without any accidents stopping it. The purchase of this equipment protection shields essentially serves the purposes of equipment preservation and promoting an effective lab environment within Building 10, Tenth Floor, B & N Corridor.

SERVICE AGREEMENT:  The contractor shall install the equipment protection shields within Building 10, Tenth Floor, B & N Corridor. 

Install and thoroughly test the shields to ensure they operate correctly. The contractor must carefully verify that the shields match the measurements specified for the equipment. This attention to detail guarantees proper fit and optimal performance of the shields, providing the necessary protection for the lab equipment. 