Opportunity

SAM #19CG5026R0010

Perimeter Wall Repair and Reconstruction at U.S. Embassy Kinshasa

Buyer

U.S. Embassy Kinshasa

Posted

July 20, 2026

Respond By

August 03, 2026

Identifier

19CG5026R0010

NAICS

238110, 238210, 238190

This opportunity involves the repair and reconstruction of the front perimeter wall at the U.S. Embassy Kinshasa's 103 Roi Baudouin residence compound. - Government Buyer: - U.S. Embassy Kinshasa, GSO/Procurement Office - Contact: Vernetta Wheeler - Scope of Work: - Demolition and removal of damaged wall sections - Rebuilding approximately 22 meters of perimeter wall using specified concrete and rebar standards - Plastering and painting of the rebuilt wall - Replacement of damaged electrical wiring and security lights to match existing quality and locations - Installation of new concertina wire and supports (provided by the Embassy) - Removal and replacement of damaged pavers, including backfilling and compacting - Contractor must supply all labor, materials, and equipment - Requirements: - All materials and workmanship must be approved by the Contracting Officer Representative (COR) - Contractor must provide safety and personal protective equipment (PPE) for all workers - Compliance with U.S. and local safety, security, and construction regulations - Submission of safety plan and hazard analyses prior to work commencement - Performance and payment bonds required (30% of contract price, reduced to 10% after final acceptance, maintained for 1-year warranty) - No specific OEMs, brands, or part numbers are specified; materials must match existing quality and design - Project must be completed within 60 days from notice to proceed, with a 1-year warranty period after final acceptance

Description

Overview of the project:

The U.S. Embassy has a project requirement to repair a section of the 103 Roi Baudouin residence Compound front perimeter wall that collapsed due to a big tree roof and a heavy rain. In addition to the collapsed portion, several addition feet will need to be rebuilt due to be unstable after the collapse. The wall is estimated to be 22m long, with the exact length needed to be repaired to be revealed during the walkthrough stage of the project solicitation.

The contractor will also make sure to replace the damaged electrical wire as well as lights, to replace the concertina wire, backfill the entrance parking and then replace the pavers.

The selected contractor will supply all labor, materials and equipment required to successfully complete this project. All material will be inspected and approved by the Contracting Officer Representative (COR) before installation can start.

The project must be completed in 60 days, and the offer must be submitted in English.

SEE ATTACHED DOCUMENT FOR FULL SOLICITATION AND SCOPE OF WORK

View original listing