The City of Fayetteville, North Carolina, is soliciting bids for the construction of the Hogan Street Multi-Use Trail project. - Government Buyer: - City of Fayetteville, Public Services Department, Purchasing Division - Project Scope: - Construction of approximately 1,030 linear feet of 8-10 foot wide multi-use trail along Hogan Street (between Madonna Drive and Murchison Road) - Includes curb and gutter installation, sidewalk construction, driveway aprons, wheelchair ramps, sodding, and related site work - Key construction activities: mobilization, traffic control, erosion control, clearing/grubbing, grading, removal of existing asphalt/concrete, aggregate base, and stone installation - Product/Service Line Items: - Mobilization and demobilization (lump sum) - Traffic control (lump sum) - Erosion control (lump sum) - Clearing, grubbing, and grading (lump sum) - Removal of existing asphalt (105 sq yd) and concrete (41 sq yd) - Select borrow (34 cu yd), permanent pavement patch (100 sq yd), incidental stone (18 tons), aggregate base course (15 tons) - Vertical curb and gutter (920 linear feet) - 4-inch (950 sq yd) and 6-inch (75 sq yd) thick concrete sidewalk - Driveway aprons (45 sq yd), wheelchair ramps (5 each) - Sodding with centipede grass (390 sq yd) - Removal/replacement of mailboxes (2 each) and relocation of street signs (6 each) - Notable Requirements: - 10% Small Disadvantaged Business Enterprise (SDBE) participation goal - Compliance with North Carolina laws and E-Verify - Detailed construction specifications for erosion control, traffic management, and utility coordination - Liquidated damages of $1,000 per day for late completion - One-year correction period for defective work - No specific OEMs or proprietary products are named; standard construction materials and methods are specified.
Description
The City of Fayetteville is soliciting bids for the construction of the Hogan Street Multi-Use Trail. The project includes installation of approximately 1,030 linear feet of 8 to 10 feet wide multi-use trail and curb & gutter along the south side of Hogan Street between Madonna Drive and Murchison Road. The funding source for this project is the Public Infrastructure General Obligation Bond. The City is committed to providing equal opportunity for Small Local Business Enterprises and small businesses to participate in the procurement process.