Opportunity

British Columbia BCBid #EN27DCS205

Civil Works: Supply and Installation of Steel Pipes, Culverts, and Rip Rap at Prospect FSR, Merritt, BC

Posted

June 24, 2026

Respond By

July 30, 2026

Identifier

EN27DCS205

NAICS

237990, 237120

This opportunity involves civil engineering works for the Ministry of Forests, Engineering Branch in British Columbia at the Prospect FSR site in Merritt. - Government Buyer: - Ministry of Forests, Engineering Branch, British Columbia, Canada - Project: EN27DCS205 - K1825 & K1781 Prospect FSR HWSP Installs - Products and Materials Requested: - Steel pipes in various diameters (2,438mm, 2,743mm, 610mm) - Armtex #250 geotextile (6 units) - Services Requested: - Supply, transport, and installation of culverts and steel pipes - Development, hauling, and placement of rip rap, shot rock capping, and pit run - Excavation and removal of sediment and unstable materials - Construction of engineered rock fill and outlet rip rap spillway - Stream diversion works - Comprehensive survey, site preparation, and final site survey - Unique or Notable Requirements: - Mandatory site visit for all bidders - Strict adherence to detailed design and scope in attached documents - Project located in the Cascades Natural Resource District, Merritt, BC - No specific OEMs or vendors are named in the solicitation - All work must comply with the provided technical specifications and design documents

Description

This solicitation is for the supply, transport, and installation of culverts and steel pipes, development and placement of rip rap, shot rock capping, and pit run, excavation and removal of sediment and unstable materials, construction of engineered rock fill and outlet rip rap spillway, stream diversion works, and all related survey and site preparation work. The project site is located in the Cascades Natural Resource District, Merritt, British Columbia, Canada. A mandatory site viewing meeting is scheduled for July 8, 2026, at the bottom of Prospect FSR. Bidders must comply with the detailed design and scope outlined in the attached documents and review all appendices and schedules for comprehensive requirements.

View original listing