Opportunity
SAM #W50S8D26QA015
Relocation of Generac SBE500 Battery Energy Storage System (BESS) from Dover AFB to Stewart ANGB, NY
Buyer
USAR NGAUS
Posted
July 17, 2026
Respond By
August 06, 2026
Identifier
W50S8D26QA015
NAICS
488510, 488490, 484220
This opportunity involves the relocation of a Generac SBE500 Battery Energy Storage System (BESS) for the Department of the Air Force, 105th Airlift Wing (ANG), at Stewart Air National Guard Base (ANGB), New York. - Government Buyer: - Department of the Air Force, 105th Airlift Wing (ANG), W7NR USPFO Activity NYANG, 105AW CE - OEMs and Vendors: - Generac (OEM of the SBE500 BESS) - Products/Services Requested: - Relocation of one Generac Model SBE500 Battery Energy Storage System (BESS) - Part number: SBE500 - Lithium Ion batteries, 480V, 250 kW rated power, 500 kWh usable energy capacity - Dimensions: 13.8 ft x 8 ft x 9.6 ft; Weight: approx. 27,062 lbs - Compliance with UL 1642, UL 1973, UL 9540A, UL 1741 SB, UL 9540, CSA 22.2, UN 38.3, IEEE 1547, NFPA 855, NFPA 69, NFPA 68 - Services include: - Pre-transport visual inspection and documentation - Loading at contractor storage lot near Dover AFB, Delaware - Transportation to Stewart ANGB, Newburgh, NY - Offloading onto contractor-provided dunnage to prevent ground damage - All personnel, equipment (cranes, forklifts), and materials provided by contractor - Compliance with safety, quality control, and security requirements - Documentation and adherence to all specified standards and regulations - Unique/Notable Requirements: - Contractor must provide all loading/unloading equipment; government will not supply cranes or forklifts - Strict adherence to safety, UL, and NFPA standards - Quality control, security, and training requirements apply - Firm fixed price contract; award based on lowest cost and compliance
Description
There is NO incumbent contractor or existing contract in place for this requirement. This is a first time requirement.
Relocation of a Generac Model SBE500 Battery Energy Storage System (BESS) from a contractor storage lot in the vicinity of Dover Air Force Base (AFB), Delaware, to a designated site at Hanger 101, Stewart Air National Guard Base (ANGB), New York. Contractor will be responsible for, but not limited to: visually inspecting BESS and documenting, load and transfer BESS to 12550, off load BESS on dunnage provided by the contractor for BESS to ensure no damage to the ground surface. All other requirements for this project are listed in the attached Performance Work Statement (PWS). I've also attached a picture of the BESS and the spec sheets. NOTE: the contractor is responsible for loading and offloading the BESS. The government will NOT supply a crane, forklift, or any other means to perform this task. Loading and offloading the BESS is the responsibility of the contractor.