Opportunity

Reno Planet bids #H100141

City of Reno 2026 I&I Mitigation Project: Storm Drain and Sanitary Sewer Separation

Posted

July 16, 2026

Respond By

July 30, 2026

Identifier

H100141

NAICS

237110, 237310, 237990

The City of Reno Public Works Department is seeking a contractor for the 2026 I&I Mitigation Project, focused on separating storm drain and sanitary sewer systems at multiple locations in Reno, Nevada. - Government Buyer: - City of Reno Public Works Department - Project Scope: - Removal of cross connections between storm drains and sanitary sewers - Installation of storm drain and sanitary sewer pipes (PVC SDR-35 and RCP, 8" to 24" diameters) - Construction of manholes (Type I and V), catch basins, and concrete structures (sidewalks, ADA ramps, curbs, gutters, alleys, commercial driveways) - Asphalt pavement patching, grind and overlays, and pavement markings (thermoplastic striping, crosswalks, curb paint) - Installation of traffic signal loop detectors and adjustment of conduit lines - Water main and service lateral work in coordination with TMWA (Truckee Meadows Water Authority) - Storm water protection, traffic control, and CCTV inspection services - Removal of existing oil tank and abandoned water infrastructure (as contingent items) - Products/Services Requested: - Over-excavation and backfill (60 CY) - Installation of various sizes of PVC and RCP pipe (totaling over 1,800 LF) - 13 Type I manholes, 1 Type V manhole, 9 catch basins - 10,871 SF concrete alley, 823 SF commercial driveway, 550 SF stamped sidewalk, 415 SF standard sidewalk - 1,148 LF and 4,283 SF of bituminous pavement patching, 19,747 SF grind and overlay - 490 LF thermoplastic crosswalks, 270 LF double yellow striping, 400 LF dashed striping - 5 traffic signal loop detectors, 6 conduit adjustments - 16 manhole structure adjustments with City of Reno logo covers - 78 days of storm water protection, 1 lump sum for traffic control, 1 CCTV inspection - Unique/Notable Requirements: - Compliance with Nevada prevailing wage and apprentice utilization laws - Coordination with TMWA for water infrastructure work - Environmental and safety compliance, including storm water pollution prevention - Electronic and original bid bond submission - No specific OEMs or product manufacturers are named in the solicitation. - Estimated contract value: $2.1 million to $2.4 million - Project duration: 78 working days

Description

The City of Reno Public Works Department is soliciting proposals for the 2026 I&I Mitigation Project under Contract Number H100141. The project involves removal of existing cross connections between storm drains and sanitary sewer systems at various locations, including installation of storm drain pipe, manholes, AC permanent patch, grind and overlays, and concrete work. Proposals must include all labor, tools, machinery, materials, and incidentals necessary to complete the work. The estimated contract value ranges from $2.1 million to $2.4 million, with a project duration of 78 working days. A virtual bid opening will be held via Microsoft Teams.

View original listing