New York State Contract Reporter #2137214

South Barry Avenue Bridge Replacement – Prestressed Concrete Beam Bridge and Utility Relocation

Posted

July 17, 2026

Respond By

August 27, 2026

Identifier

2137214

NAICS

237310, 237110, 237990, 238190, 238110

This opportunity involves the replacement of the South Barry Avenue bridge over Otter Creek Tidal Basin in the Village of Mamaroneck, NY, managed by the Town of Rye and NYSDOT Region 8. - Government Buyer: - Town of Rye, Westchester County, NY - NYS Department of Transportation, Region 8 - Scope of Work: - Demolition of an existing 29-foot span steel girder bridge - Construction of a new 46-foot span prestressed concrete beam bridge (single-span, integral abutment pile foundations) - Minor roadway reconstruction on approaches - Installation of guiderails, bridge and pedestrian railings - Relocation of utilities including water main (8" ductile iron), gas main (8" steel sleeve), and future sewer sleeve (12" steel sleeve) - Concrete sidewalk improvements, colored and imprinted sidewalks, stone curbs, and decorative landscaping - Drainage structures, underdrain filters, and environmental protection measures - Temporary and permanent traffic control (signals, barriers, pavement markings) - Products/Materials Requested (examples): - Prestressed concrete voided slab beams (14 units, ITEM 563.03) - Micropiles (10.75" and 12.75" diameter, permanent casing) - Structural and performance concrete, epoxy-coated rebar, shotcrete, UHPC - Steel bridge and pedestrian railings, box beam guiderails, stone curbs - Asphalt and concrete pavement, topsoil, turf, weed control fabric - Utility conduits (galvanized steel, rigid plastic), drainage structures, manholes - Unique/Notable Requirements: - Compliance with NYSDOT Standard Specifications (May 2026) - Federally aided project with prevailing wage rates and EEO goals (22.6% minority, 6.9% women employment) - Use of NYSDOT-approved civil rights reporting software (EBO) - Contractor registration with NYS Department of Labor - Performance and payment bonds required - Only contractors on the official Plan Holders List may bid - Staged construction with phased utility relocations and environmental protections - No specific OEMs are named; materials must meet NYSDOT and federal standards.

Description

This solicitation is for the replacement of an existing 29-foot span steel girder bridge with a new 46-foot span prestressed concrete beam bridge located in the Village of Mamaroneck, Westchester County, NY. The work includes minor roadway reconstruction on the approaches, guiderail installation, water main relocation, and concrete sidewalk improvements for access to the Otter Creek Preserve. The project requires all labor, materials, machinery, tools, and equipment necessary to complete the work as shown on the plans and described in the specifications. Bids must be submitted by August 27, 2026, at 1:00 PM local time.

View original listing