Opportunity
Saskatchewan Tenders #HWY-H26081-APPN
Highway 49 Culvert Replacement and Roadwork Procurement (Saskatchewan Ministry of Highways)
Posted
July 15, 2026
Respond By
July 30, 2026
Identifier
HWY-H26081-APPN
NAICS
237310, 237990
This opportunity is for a culvert replacement and associated roadwork project on Highway 49 in Saskatchewan, managed by the Saskatchewan Ministry of Highways. - Government Buyer: - Saskatchewan Ministry of Highways (Highways Division) - Project Scope: - Supply and installation of two 2400 mm diameter polymer laminated corrugated steel pipe culverts (total length: 46 meters) - Culverts: 2400 mm x 23 m, 125 mm x 25 mm corrugations, 2.8 mm wall thickness, segment lengths of 17 m and 6 m per culvert - Two semi-corrugated couplers with gaskets - Removal and disposal of 27 meters of existing culverts - Earth excavation (1,060 meters) - Supply and placement of topsoil (30 m³) - Earth embankment (640 m³) - Granular base course (340 tonnes) - Asphalt concrete (65 tonnes) - Random riprap Type II (150 m³) - Supply and installation of silt fence (100 meters) - Supply and installation of erosion control blanket (900 m²) - Granular backfill in place (750 m³) - Materials and Responsibilities: - The Ministry will supply the culverts and couplers - Contractor must supply borrow material, granular backfill, geotextiles, riprap, sub-base course, granular base course, asphalt concrete, and erosion control materials - Quantities are initial estimates and may change in the final tender documents - No specific OEMs or vendors are named for the materials; the Ministry will procure the culverts in advance to expedite construction - Notable Requirements: - Large-diameter, polymer laminated corrugated steel pipe culverts - Emphasis on erosion control and environmental protection measures
Description
This is an advance notice for the procurement of a contractor to complete a culvert replacement on Highway 49 between Pelly and Norquay, Saskatchewan. The work involves the supply and installation of two 2400 mm diameter polymer laminated corrugated steel pipe culverts by open excavation of the roadway for a total length of 46 meters. The project includes removal and disposal of existing culverts, earth excavation, supply and placement of topsoil, earth embankment, granular base course, asphalt concrete, riprap, silt fence, and erosion control measures. The work is expected to start as early as August 2026 with a completion date by October 1, 2026, and quantities are subject to change.