The City of Moab, Utah is seeking bids for the Pack Creek Pedestrian Bridge Replacement and Channel Restoration Project, focusing on construction and environmental restoration services. - Government Buyer: - City of Moab, Recorders Office - Project Scope: - Replacement of the existing pedestrian bridge with a prefabricated steel truss bridge - Channel restoration including sediment and debris removal, channel realignment, and erosion protection - Installation of a concrete apron under the new bridge for utility and erosion protection - Placement of various classes of riprap and riprap subbase for channel and bank stabilization - Installation of turf reinforcing mat and reseeding of disturbed areas for landscape restoration - Demolition and removal of the existing bridge, trail, and related structures - Construction of ADA-compliant pedestrian trail with railing - Dewatering and river management, including coffer dams and pumping - Tree removal and trimming as needed for site access and restoration - Products/Services Requested (with quantities where specified): - 1 prefabricated steel pedestrian truss bridge (including procurement and installation) - 1 concrete apron (utility/erosion protection) - 30 units of Class I compacted rock riprap - 440 units of Class V compacted rock riprap - 20 units of Class VIII toe rock for bank protection - 92 units of riprap subbase - 1400 units of turf reinforcing mat - 0.5 units of reseeding for disturbed areas - 1 unit each of mobilization, field survey, dewatering, construction access, sediment and debris removal, tree removal, culvert cleaning, demolition, and pedestrian trail construction - Unique/Notable Requirements: - Compliance with safety, environmental, and quality control standards - Liquidated damages of $1,000 per day for delays beyond contract time - Mandatory in-person pre-bid meeting and electronic bid submission - Bid security and performance/payment bonds required - Strict completion timelines: substantial completion within 60 days, final completion within 90 days of notice to proceed - No specific OEMs or vendors are named in the solicitation; the prefabricated steel truss bridge is a key product but manufacturer is not specified.

Description

This project involves the construction of the Pack Creek Pedestrian Bridge Replacement and Channel Restoration. The scope includes removing sediment and debris near the pedestrian bridge, excavating sediment deposits in main and tributary channels and overbank areas to protect the bridge and trail from erosion hazards. It also includes installing a concrete apron on the channel bottom and banks to protect bridge abutments, installing riprap on the downstream side of three existing culverts, and providing erosion protection along the Pack Creek channel. The work requires all labor, materials, tools, and equipment as described in the plans and specifications.

View original listing