Opportunity
SAM #W911RZ26QA032
Repair and Upgrade of POL Storage Shelters at Fort Carson
Buyer
MICC Fort Carson
Posted
July 15, 2026
Respond By
July 31, 2026
Identifier
W911RZ26QA032
NAICS
238220, 238290, 237120
This opportunity involves the repair and upgrade of petroleum, oil, and lubricant (POL) storage shelters for the U.S. Army at Fort Carson, managed by the Mission Installation Contracting Command (MICC) and the 404 Aviation Support Battalion. - Government Buyer: - Department of the Army, MICC-FT Carson, 404 Aviation Support Battalion - Scope of Work: - Repair and upgrade three POL storage shelters (serial numbers 24587, 24588, 24589) - Remove outdated heating and electrical components - Install new heaters (FF, EP, 10KW, 34K BTU, 208/3/60, without thermostat) in two shelters - Install three non-explosion-proof light and fan switch kits (two-switch assemblies) - Install two explosion-proof interior light assembly kits - Provide all labor, equipment, materials, packaging, shipping, removal, installation, and testing - Products/Services Requested: - 2 heaters (FF, EP, 10KW, 34K BTU, 208/3/60, W/O thermostat) - 3 switch, light & fan kits (non-explosion proof, 2 switches) - 2 interior light assembly kits (explosion-proof) - Packaging, shipping, removal of old equipment, installation, and testing - Unique/Notable Requirements: - All work must restore temperature-controlled environments for safe POL storage - Contractor must provide turnkey service including removal, installation, and testing - No specific OEMs or part numbers are specified; open to equivalent commercial products - Set aside for small businesses under NAICS code 237120
Description
The contractor shall remove outdated heating and electrical components and install new, fully functional systems tailored to each shelter’s needs. Work includes replacing the existing 10kW, 34K BTU electric heaters in Shelters 1 and 2; installing new non-explosion-proof light and fan switch kits (two-switch assemblies) in all applicable shelters; and providing new explosion-proof interior light assemblies in Shelters 2 and 3. All repairs must ensure the shelters meet operational requirements for the safe storage of petroleum, oil, and lubricants and restore reliable environmental control across the facility.