Opportunity
SAM #FA283526Q0020
Giant Voice Remote Terminal Unit Relocation at Hanscom AFB
Buyer
AFLCMC Hanscom PZI
Posted
July 15, 2026
Respond By
August 10, 2026
Identifier
FA283526Q0020
NAICS
811210, 238210, 237130
This opportunity involves the relocation of a Giant Voice (GV) Remote Terminal Unit (RTU) at Hanscom Air Force Base, Massachusetts, for the U.S. Air Force Life Cycle Management Center and the 66th Air Base Group Communications and Information Division. - Government Buyer: - U.S. Air Force Life Cycle Management Center (AFLCMC), 66th Air Base Group Communications and Information Division, Hanscom AFB - Products/Services Requested: - Relocation of one Giant Voice Remote Terminal Unit (RTU) within building 1108 - Includes site survey, power and cabling assessment, controlled power-down, transport, reinstallation, programming, alignment, optimization, and post-move testing - Deliverables: master project schedule, site survey report, cutover/migration plan, post-installation test report, and final system acceptance - Service line items: - Site survey and cutover/migration planning - RTU physical relocation and reinstallation (including handling of RF cabling, network connections, power configurations, and grounding systems) - Post-move testing, optimization, and validation of operational status - Unique/Notable Requirements: - Contractor must provide all specialized labor, materials, tools, equipment, and supervision - Adherence to security and operational protocols is required - The RTU is part of the ATI Mass Alert system, managed by REACT 5000 Central Control Units - Comprehensive post-move testing and documentation are mandatory - OEMs and Vendors: - No specific OEMs or part numbers are mentioned in the solicitation or attachments - Quantities: - One (1) Giant Voice RTU to be relocated
Description
Relocate one (1) Giant Voice (GV) Remote Terminal Unit (RTU) from the 3rd floor of building 1108. This RTU is one of six RTUs that are part of the base-wide ATI Mass Alert system, which is controlled by two Central Control Units (REACT 5000s). The Contractor shall provide all specialized labor, materials, tools, equipment, and supervision required to safely power down, physically transport, re-install, and re-integrate the system. The objective is to ensure the RTU is restored to Full Operational Capability (FOC) in the new location. This includes the proper handling of all associated radio frequency (RF) cabling, network connections, power configurations, and grounding systems, as well as conducting comprehensive post-move testing and optimization to verify system integrity.
NOTE: A site visit is scheduled for 23 July 2026 at 9:00am EST at Hanscom AFB, MA. You MUST register prior to attending. Registration to attend the site vist must be provided to kennethea.berry.1@us.af.mil no later than, Monday 20 July 2026 at 10:00am, see attached for registration form.