Opportunity
Port of Portland Planet bids #2026-14184
Portland International Airport Sanitary Lift Station C15 Replacement Solicitation
Posted
July 14, 2026
Respond By
August 13, 2026
Identifier
2026-14184
NAICS
237110, 238220, 238210, 562998
This opportunity involves the replacement of the Sanitary Lift Station C15 at Portland International Airport, managed by the Port of Portland Engineering division. - Government Buyer: - Port of Portland, Engineering division, Portland International Airport - Project Scope: - Demolition of the existing sanitary lift station at Gate C15 - Installation of a new pre-packaged sanitary lift station and inline sewage grinder - Temporary sewage bypass system during construction - Construction of new electrical vaults with aircraft-rated lids, precast concrete structural lids, and aircraft-rated metal hatch covers - Installation of airfield concrete panels, steel reinforcement, and surface-mounted steel pipe bollards - Replacement of pumps, pipes, floats, rails, valves, and conduits - Environmental controls, including contaminated soil handling and management - Erosion and sediment control, traffic control, and escort services - Electrical work including demolition and installation of pumps, floats, wiring, raceways, control panels, and vaults - Environmental evaluation and soil/groundwater sampling for PFAS, metals, VOCs, and petroleum hydrocarbons - Products/Services Requested: - Pre-packaged wastewater lift station (including wet well, valve vault, pumps, piping, valves, controls, training, and commissioning) - Inline sewage grinder (including precast structure, piping, valves, controls, training, and commissioning) - Temporary bypass pumping system - Concrete pavement, lean concrete base, crushed aggregate base, joint sealing filler - Environmental evaluation and soil sampling services - Quantities: - 1 pre-packaged lift station, 1 inline sewage grinder, 1 temporary bypass system, 415 units of pavement removal, 195 units of contaminated soil handling, 175 units of concrete pavement, and other construction materials/services as detailed - Notable Requirements: - Compliance with airport security and environmental controls - Prevailing wage laws apply - Electronic bid submission via PlanetBids - No prequalification required; virtual pre-bid meeting available - Coordination with other airport construction activities; strict construction schedule (substantial completion within 42 days of Notice to Proceed) - OEMs/Vendors: - No specific OEMs or vendors are named in the solicitation; the project covers a broad range of construction, plumbing, electrical, and wastewater treatment equipment and services
Description
This solicitation is for the demolition of an existing lift station and the provision of a new sanitary lift station and sanitary sewer grinder at Gate C15 of Portland International Airport. The project includes providing a temporary sewage bypass, new electrical vaults with aircraft-rated lids, precast concrete structural lids, aircraft-rated metal hatch covers, airfield concrete panels, and steel reinforcement. Additionally, the replacement of pumps, pipes, floats, rails, valves, and conduits is required. Bids must be submitted electronically through the Port's online bidding system by August 13, 2026, and a pre-bid meeting will be held via Microsoft Teams on July 21, 2026.